BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Marshall, Michigan. Conceptual plans call for the construction of a municipal facility; for site work for a municipal facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Description: The Calhoun County Solid Waste Program is responsible for providing recycling centers and collection events for hard to recycle/dispose items for Calhoun County residents. Current programming includes the source-separated Marshall Recycling Center, our source-separated mobile recycling trailer, a single-stream roll-off one weekend a month in Clarence Township, and a free pass program to use the single-stream recycling compactor at the C&C Landfill. Additionally, the county provides two appliance/scrap metal collections, two electronics collections, four hazardous waste collections, and three scrap tire collections annually. Programming is mainly funded through a host agreement with the C&C Landfill, which is operated by Republic Services. The vision of this project entails the construction of a 7,500 to 10,000 square foot building, designed to accommodate drive-through traffic for recycling purposes. To support these operations, acquisition of equipment such as a horizontal closed-end baler, a scale for shipping and reporting, self-dumping forklift hoppers, and a forklift is planned. This equipment will facilitate baling, shipping, and material management efficiently and sustainably. The facility will incorporate an office and restroom facilities for staff members, along with storage areas for both loose and baled materials. Additionally, plans include the installation of a loading dock to facilitate shipping and a concrete pad to hold roll-offs. All paved areas, including drives and parking lots, will comply with township regulations, utilizing either asphalt or concrete based on designated use. Moreover, adherence to zoning requirements will govern fencing, parking, storage, and lighting installations. Recently, Calhoun County applied for a $500,000 EGLE Recycling Infrastructure Grant. This would be combined with funds available in the Solid Waste Program's 2024 budget and available fund balance. The County is actively seeking additional funding from The Recycling Partnership and will pursue commodity-specific funding towards the inclusion of electronics and scrap tires. The selected firm will lead the design, planning, engineering, and construction of the center. The Calhoun County Solid Waste Program seeks firms that navigate the intersection of design, creativity, cost consciousness, and engineering expertise. Prompt email communication and regular check-in meetings with designated county staff will be required. Questions that arise as a result of this RFQ should be submitted at online. Questions are due by Thursday, July 11, 2024 @ 5:00 PM. The County reserves the right to accept or reject any or all Statements of Qualifications and to waive informalities and irregularities in responses, and to accept any response determined by the County to be in the best interests of the County.

Conceptual

Municipal

$200,000.00

Public - County

New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
227
Active Projects
139
Bidding Soon
1,900
All Active Projects
720
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 24, 2025

img_map_placeholder

To Be Determined, Marshall, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.