Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Remodeling of a playground / park / athletic field in Perry, Missouri. Completed plans call for the remodel of a playground / park / athletic field.
Bid proposals for the remodel of the bandstand in the Perry city park. All work to be completed within 100 days of notice to proceed. If awarded the bid(s) the contractor must provide a certificate of liability insurance with the city of Perry listed as an additional insured, and a hold harmless agreement between the contractor and the City of Perry. The city reserves the right to reject any and all bids. WORK TO BE COMPLETED ON BANDSTAND 1 ) Roof: The metal decorative piece on the top of the roof to be removed, painted matte black and re-attached. Remove and dispose of shingles and underlayment. Repair sheeting as needed. Install new white drip edge and ice and water shield underlayment. Install Certainteed landmark Moire Black shingles. Remove/replace facia board with 1x pine wrapped in aluminum 2) Soffit, support beams (headers), support columns, ceiling, and rim joist: remove crown molding and cover soffit, support beams, columns, ceiling and rim joist with white metal to match facia. One new column to be built on the east side top of stairs to match all other columns. 3) Basement walls: Remove all the wood and metal vents and replace them with cemented concrete blocks. Remove plywood on the east side of stairs and replace it with concrete block or solid surface to match the rest of the foundation. Cut off at ground level and cap the old tile drainpipe on the south side of the building. Power wash and skim coat with concrete all the basement walls to make the entire wall surface even and all the same. 4) Banisters and railing: remove and replace with white vinyl railing with black metal banisters and install a metal hand railing on one side of the stairs. Final design to be approved by the city. 5) Guttering: install white gutters with gutter guards and downspouts. 6) Lighting: install 6 can lights in the ceiling. 7) Floor: repair section at top of stairs and sand, stain and seal the entire floor. 8) Paint, caulk: power wash steps and basement walls and basement door and paint the basement walls and basement door and both sides of the walls on the steps, but no paint on the steps themselves Sherwin Williams exterior paint two coats of paint. Caulk where needed around basement walls prior to painting. Color is determined by the city. 9) Contact Aiderman Jackson for specific details:573-406-2777 Orsalijcj@hotmail.com.
Award
Playgrounds / Parks / Athletic Fields
$43,899.00
Public - City
Remodeling
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 6, 2024
September 5, 2024
To Be Determined, Perry, MO
Related To This Project
Perry, MO
Bid Date: Apr 02 2024
Perry, MO
Bid Date: Jan 18 2024
Perry, MO
Bid Date: Mar 07 2023
Perry, MO
Bid Date: Feb 21 2023
Perry, MO
Bid Date: Feb 14 2023
Perry, MO
Bid Date: Jan 03 2023
Perry, MO
Bid Date: Oct 20 2021
Cameron, MO
Bid Date: Jul 18 2024
Doniphan, MO
Bid Date: Jul 24 2024
Jefferson City, MO
Bid Date: Aug 08 2024
Ballwin, MO
Bid Date: Jul 18 2024
Joplin, MO
Bid Date: Jul 30 2024
Plattsburg, MO
--
Perryville, MO
Bid Date: Jul 22 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.