BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Van Buren, Arkansas. Completed plans call for site work for a water / sewer project.

This project includes the construction of the Downtown Van Buren drainage improvements as shown on the Plans. The Work of this Contract is located along the 200 to 400 block of Main Street in Downtown Van Buren Arkansas and along Washington Street. SCOPE OF WORK The Work of this Contract is located along the 200 to 400 block of Main Street in Downtown Van Buren Arkansas and along Washington Street. Furnish all labor, materials, equipment and incidentals required and construct the Van Buren Flood Control - Storm Water Management project in its entirety as shown on the Drawings and as specified herein. C. The Work includes, but is not necessarily limited to the following: 1. Construction of drainage system improvements SCOPE OF WORK A. STREETSCAPE LIGHTING AND ELECTRICAL Electrical General Provisions SECTION 16000 1. The Contractor shall supply and install new raceways and conductors beneath the proposed streetscape concrete construction. The Contractor shall supply and install new concrete electric handholes as shown on the Drawings to connect new raceways. The Engineer acknowledges that issues may arise that require a change in project scope and price based on uncovered conditions. B. The scope of the work consists of the furnishing and installing of complete electrical systems. The Contractor shall provide all supervision, labor, materials, equipment, machinery, and any and all other items necessary to complete the systems. The Contractor shall note that all items of equipment are specified in the singular; however, the Contractor shall provide and install the number of items of equipment as indicated on the drawings and as required for complete systems. C. It is the intention of the Specifications and Drawings to call for finished work, tested, and ready for operation. D. Any apparatus, appliance, material or work not shown on drawings but mentioned in the specifications, or vice versa, or any incidental accessories necessary to make the work complete and perfect in all respects and ready for operation, even if not particularly specified, shall be furnished, delivered and installed by the Contractor without additional expense to the Owner. E. Minor details not usually shown or specified, but necessary for proper installation and operation, shall be included in the Contractors estimate, the same as if herein specified or shown. F. With submission of bid, the Contractor shall give written notice to the Engineer of any materials or apparatus believed inadequate or unsuitable, in violation of laws, ordinances, rules; any necessary items or work omitted. In the absence of such written notice, it is mutually agreed the Contractor has included the cost of all required items in his proposal, and that he will be responsible for the approved satisfactory functioning of the entire system without extra compensation. G. Provide all temporary power for construction. Coordinate requirements with other trades. H. Provide all electrical demolition work associated with abandonment or relocation of existing facilities, including disconnecting and removal of all conduit and cable to equipment being removed. There is a $22.00 non-refundable download delivery fee for a PDF copy (electronic) of the bidding documents

Post-Bid

Water / Sewer

$750,000.00

Public - City

Site Work

21

17

2

6

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
42
Bidding Soon
470
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2024

August 26, 2024

img_map_placeholder

Multiple Locations, Van Buren, AR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.