BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2025 at 7:00 PM

Updated August 14, 2025

Site work and paving for a mixed-use development in Eastpoint, Florida. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and road / highway.

As of February 21, 2025, an engineer has been selected and this project is in the design phase with anticipated completion in July 2026. A firm timeline for bidding and start of construction has not been determined. *The closed solicitation has been included below for reference: District : 03 Selection Method : Letter of Response and Interview Project Description : SR 30 (US 98) Bike Path/Trail Design Group 2 Plain Language Description : The Department intends to award two contracts from this procurement. The will perform all services necessary to design a complete set of construction plans and bid documents for a bike path/trail on SR 30 (US 98) from Crooked River Road to US 319. The consultant will perform all services necessary to design a complete set of construction plans and bid documents for a bike path/trail on SR 30 (US 98) from Lake Morality Rd to Hinton Street. Services will include, but are not limited to roadway design, survey, minor bridge design, load rating, signing and pavement marking, lighting, and geotechnical. Number of contracts that may be awarded from this advertisement : 2 Response Deadline Date/Time 7/23/2024 02:30 am Shortlist Selection Date/Time 8/05/2024 07:30 pm Phase II Submittal Deadline Date/Time 8/28/2024 01:30 am Consultant Interviews Date/Time 8/29/2024 Final Selection Date/Time 9/16/2024 07:30 pm Negotiations Period Begin Date 10/01/2024 Negotiations Period Ending Date 11/26/2024 The method of contractor selection has not been determined at this time. FL DOT - RFP Engineering - SR 30 (US 98) Bike Path/Trail Design Group 2

Design

Sidewalks / Parking Lot

$2,500,000.00

Public - State/Provincial

Paving, Site Work

4

8

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
38
Bidding Soon
429
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2026

Project location map

FL-30, Eastpoint, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.