BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2024 at 8:00 PM

Updated August 13, 2024

Demolition, site work, renovation and addition to a mixed-use development in Murray, Utah. Working plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Murray City School Dist is seeking to replace the existing Riverview Junior High School Associated improvements. MCSD is also seeking to add a classrm building to the existing Murray High School Contacts Nikki Sanchez nsanchez@utah.gov This courtesy posting is an advertisement of a procurement opportunity for Murray City School District, not the Division of Purchasing. Responses should be directed to the designated individual/office as designated in the solicitation document. The contract award for this solicitation will not be posted on this website. Instead, you will need to contact the designated individual/office as identified in the solicitation document QUESTIONS: All Questions must be submitted online and received by noon (12:00 PM) on July 15, 2024. Award Construction start-May 2025 Substantial Completion and Punch-June 1, 2027 Warranty end-June 1, 2028 The school is anticipated to be no greater than 165,000 sq ft in size. It is anticipated the program will be a modified version of the Hillcrest Junior High currently operating in the district which is sized for 900 students. The new Riverview Junior High is anticipated to be sized for 750 students consisting of 6 th ,7 th and 8 th grade students. The Construction Budget is currently estimated at $80,000,000. The Junior High building itself will include but not be limited to classrooms, administration spaces, SPED and STEM classrooms, an Auditorium, Gymnasium, as well as custodial and operational support spaces

Final Planning

Educational

$650,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
86
Bidding Soon
1,015
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2024

February 12, 2025

Project location map

Multiple Locations, Murray, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.