BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Salisbury, North Carolina. Completed plans call for the renovation of a educational facility.

Chiller Replacements at Hanford Hanford Dole ES Replacement of McQuay Chiller Model ALS155AS27 with a compatible Model chiller of Capacity and voltage. Removal of all line voltage and low voltage wiring. The installation on all wiring to New Chiller. Removal of Chilled water piping from old chiller. The installation of Chilled water piping to new chiller including installation of tees with New Butterfly valves for future temporary chiller. Replacement of all Temperature and pressure Gauges on chilled water pipes. Replacement of all insulation on chilled water pipes outdoors. Start-up of new Chiller. School district must be under contract no later than September 30,2024 and work completed prior to December 15, 2024. These projects are federally funded through the Elementary and Secondary School Emergency Relief Fund (ESSER Fund) and is subject to the Davis Bacon General Wage requirements. Any questions pertaining to the pre-bid meeting can be directed to Jeff Holshouser, Director of Construction at 704-223-8473.

Award

Educational

$327,160.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
71
Bidding Soon
1,173
All Active Projects
478
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2024

September 2, 2024

img_map_placeholder

Multiple Locations, Salisbury, NC

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.