Site work and renovation of a civil project in Holstein, Iowa. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
construction of Holstein Wastewater System Improvements in and for the City of Holstein, Iowa. The general project location is as follows: 5606 German Avenue Holstein, Iowa 51025 Holstein Wastewater System Improvements: One (1) Contract shall be awarded for all sections, with each section being described as follows: Section 1: Submerged Attached Growth Reactor (SAGR) and Lagoon Aeration System Equipment 1.1 Furnishing all material, equipment, labor, and manufacturer's design for a new aerated lagoon system and SAGR. Includes, but is not limited to, all manufacturer provided equipment and materials including aeration system, SAGR system, blowers, blower controls, and all necessary manufacturer appurtenances. Section 2: Sludge removal and General Civil, Architectural, Structural, Electrical, Controls, Process and Other Work, and Construction per Drawings and Specifications 2. 1 Furnishing all material, equipment, labor not included in Section 1 for the SAGR and lagoon aeration system to become complete and fully operational. Includes, but is not limited to, SAGR structure, UV/Blower structure, Lift Station Building, Lift Station, electrical and controls improvements, miscellaneous concrete structures, splash pads, piping, valves, process piping, and all necessary appurtenances not included in Section 1. 2.2 Furnishing all material, equipment, labor necessary for the decommissioning of the existing lagoon cells, including but not limited to, structures, piping, valves and appurtenances, sludge removal and disposal, as indicated in the Drawings and Specifications. Work also includes grading, landscaping, controls, seeding, maintenance, and all other miscellaneous items to complete the Work in accordance with Drawings and Specifications. 2.3 Furnishing all material, equipment, labor necessary for removal and disposal of sludge from existing lagoon cells as indicated in the Drawings and Specifications. Work also includes hauling and disposing of sludge material removed from existing lagoons. Question Deadline 07/30/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Est. Completion Date: Oct. 31, 2025 The Work on this project shall commence within ten (10) days after receipt by the contractor of a written Notice to Proceed. The Project shall be substantially complete by October 31, 2025, and final completion by December 31, 2025, subject to any changes in the contract period as provided for in these Specifications. Liquidated damages in the amount of $750 per calendar day will be assessed for each day that the work shall remain uncompleted after October 31, 2025 with due allowance for extensions of the contract period due to conditions beyond control of the Contractor.
Award
Water / Sewer
$7,141,983.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 6, 2024
October 7, 2024

5606 German Ave, Holstein, IA
Related To This Project
Holstein, IA
--
Holstein, IA
Bid Date: Apr 08 2021
Holstein, IA
Bid Date: Jul 29 2025
Holstein, IA
Bid Date: Jun 18 2024
Holstein, IA
Bid Date: Sep 01 2021
Holstein, IA
Bid Date: Aug 09 2019
Holstein, IA
Bid Date: Nov 20 2019
Holstein, IA
Bid Date: Dec 06 2021
Holstein, IA
Bid Date: Nov 03 2022
Grundy Center, IA
Bid Date: Aug 01 2024
Ames, IA
Bid Date: Jul 31 2024
Waterloo, IA
Bid Date: Jul 24 2024
Council Bluffs, IA
Bid Date: Jul 30 2024
Burlington, IA
Bid Date: Aug 06 2024
Spirit Lake, IA
Bid Date: Aug 08 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.