BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2026 at 8:00 PM

Updated June 11, 2026

Site work and new construction of a mixed-use development in Fernie, British Columbia. Completed plans call for the construction of a 25,000-square-foot, one-story above grade, 265-seat educational facility; and for site work for a educational facility.

A new elementary school will accommodate the growing number of elementary students in the city and alleviate enrolment pressure at the other School District owned elementary school in Fernie, Isabella Dicken Elementary. This project will be designed for a capacity of 265 (40K/225E) students in a single storey design, complete with parking, bus loop, fire access, playground, and playfields. The project will include a GHG reduction strategy, reducing operational emissions by approximately 60% compared to a LEED Gold baseline building. The NLC allowance will provide purpose-built space for Indigenous Education associated events such as talking circles for students and the greater community. The NLC allowance will also include a warming kitchen to support community functions and expand the gym.

GC Bidding

Educational

$33,500,000.00

Public - State/Provincial

LEED Certification, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
4
Bidding Soon
102
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2026

September 1, 2026

Project location map

30 Cokato Rd, Fernie, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.