BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 12, 2024 at 8:00 PM

Updated August 10, 2024

This is a service / maintenance or supply contract in Sunland Park, New Mexico. Contact the soliciting agency for additional information.

IIt is the customers responsibility to inform RFR about prevailing wage at time of proposal. If RFR is informed after the quote is issued that certified payroll is required, quote will be subject to additional charges. Delivery, installation, removal, pickup of all quoted materials equipment. This quote is based on 1 billing cycle (28 calendar days). Optional pump watch cost is provided. Rain for Rent will relocate equipment from existing location to new manhole location, extending the discharge pipe back to the new headworks. Due to the multitude of economic factors, materials, labor, hauling and freight are currently in a period of above average volatility. If, during the performance of work, the price of materials, labor, hauling or freight increases by 5% or greater through no fault of Rain for Rent, the contract price shall be equitably adjusted by an amount reasonably necessary to cover any such price increases. Equipment subject to availability at time of project. Amount $34,331.02

Post-Bid

Water / Sewer

$34,331.00

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
18
Bidding Soon
232
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2024

September 9, 2024

Project location map

Multiple Locations, Sunland Park, NM

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.