BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 14, 2025 at 7:00 PM

Updated March 11, 2025

This is a service / maintenance or supply contract in Sunland Park, New Mexico. Contact the soliciting agency for additional information.

OVERVIEW The Camino Real Regional Utility Authority (CRRUA) owns and operates water and wastewater distribution supply systems that serve customers throughout the City of Sunland Park, Santa Teresa, and facilities in the Border Area. CRRUA intends to enter into an agreement with up to four successful Proposers for the performance of Instrumentation and Control (I&C) system maintenance and repair services to ensure that communications between CRRUA's water system components is uninterrupted and that emergency repairs are made in a timely manner. SCOPE OF WORK Work included in this RFP includes, but is not limited to: 1) SCADA system troubleshooting and repair; 2) Radio/RTU component troubleshooting and repair; 3) Field instrument troubleshooting, repair and recalibration; 4) Control Panel component diagnosis, repair and component replacement; 5) Control and data conductor replacement and re-termination; 6) Computer and data network hardware troubleshooting and repair; 7) Software repair and upgrades; and 8) PLC programming, update or corrections. Work will be accomplished by issuing a Task Order under the Price Agreement. The selected Contractor(s) shall furnish documentation estimating the labor, materials, and equipment needed to perform the work for review and approval by DAC and CRRUA. The term of this contract shall be one (1) year with an option to renew by mutual consent for three (3) additional one (1) year periods. DAC and CRRUA may add to or delete from the Scope of Work set forth in this RFP. No purchases are obligated by this RFP. Proposers must be licensed as contractors in the State of New Mexico as required by State statute and must include license number in the prescribed place on the proposal form. Each unit price schedule must be submitted on the prescribed form. Interview Three (3) selected firms Evaluation Committee/Offeror Not applicable CRRUA Board Approval CRRUA Board March 2025 Contract Negotiations Evaluation Committee March 2025 Contract Execution CRRUA and Contractor April 1, 2025 Any inquiries or requests regarding clarification of this procurement document shall be submitted to the Procurement Officer in writing. Procurement Officer contact information is David Espinoza, Sunland Park Multi-Generational Center 4700 McNutt Rd. Sunland Park, NM 88008, email davide@donaanacounty.org, phone 575-589-1075. Offerors may contact ONLY the Procurement Officer regarding the terminology stated in the procurement documents. Other CRRUA employees do not have the authority to respond on behalf of the CRRUA. Offerors shall promptly notify the County Procurement Officer of any ambiguity, inconsistency, or error which they may discover upon examination of the RFP. Any response made by the Procurement Officer will be provided in writing to all Offerors by addendum. No verbal responses are authorized. No Addendum will be issued later than three (3) days prior to the date for receipt of Proposals, except an Addendum withdrawing the Request for Proposal or one which includes postponement of the date for receipt of Proposals. REJECT ALL - Pursuant to Sec 13-1-131 NMSA, 1984 Comp., as amended, the Camino Real Regional Utility Authority reserves the right to reject any and all proposals, in whole or in part, submitted hereunder, provided that such rejections shall be accomplished by a written statement declaring the reason for the rejections.

Post-Bid

Water / Sewer

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
1
Bidding Soon
148
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2025

April 1, 2025

Project location map

Multiple Locations, Sunland Park, NM

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.