BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2024 at 8:00 PM

Updated July 23, 2025

Site work for a water / sewer project in Santa Margarita, California. Completed plans call for site work for a water / sewer project.

Pursuant to Labor Code section 1770 et seq., the Contractor and all Subcontractors shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations and comply with all applicable Labor Code provisions, which include, but are not limited to the employment of apprentices, the hours of labor, and the debarment of Contractors and Subcontractors. The County reserves the right to determine the appropriateness of comments / questions that will be posted on the website. The bidder must have either a Class A license or a combination of Class C licenses that make up a majority of the work at the time the Contract is awarded (Public Contract Code section 3300). Payment bond meeting all the statutory requirements of the State of California on a form provided by the County in an amount that shall remain equal to at least one hundred percent (100%) of the Contract Price to secure payment of all claims, demands, stop payment notices, or charges of the State of California, of material suppliers, mechanics, or laborers employed by the Contractor or by any Subcontractor or any person, firm or entity eligible to file a stop payment notice with respect to the work. Performance bond meeting all statutory requirements of the State of California on the form provided by the County. The bond shall be furnished as a guarantee of the faithful performance of the requirements of the Contract Documents as may be amended from time to time including, but not limited to, liability for delays and damages (both direct and consequential) to the County and the County's separate contractors and consultants, warranties, guarantees and indemnity obligations, in an amount that shall remain equal to at least one hundred percent (100%) of the Contract Price This project will replace the existing bolted water tank with a new welded steel tank of equal capacity, complete with upgraded controls, cathodic protection, and current design standards. ENGINEER'S ESTIMATE: $1,125,350

Bid Results

Water / Sewer

$931,091.00

Public - County

Site Work

11

9

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
2
Bidding Soon
309
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2024

September 30, 2024

Project location map

Wilhelmina Ave, Santa Margarita, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.