BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Hartford, Connecticut. Completed plans call for site work for a road / highway.

The resulting Contract consists of furnishing and the installation of hot applied rubberized asphalt crack sealer or hot pour mastic to bituminous concrete pavement surface cracks, raveled longitudinal joints and raveled transverse joints. This Contract consists of furnishing and the installation of hot-applied rubberized asphalt crack sealer or hot pour mastic to bituminous concrete pavement surface cracks, raveled longitudinal joints and raveled transverse joints that do not display signs of active aggregate loss. Sealing must be Performed on transverse and longitudinal joint-reflection cracks in composite pavement. The Contractor shall maintain a clean worksite, free from all unnecessary debris during construction. The Contractor shall provide all materials, equipment, fuel, water, tools, and labor required for the installation. Joint and crack sealing must be composed and performed in accordance with specifications contained in this Exhibit A including any improvements and changes in technology that were developed following the Contract award. 1.1 Contractor Capacity and Crew Size: The Contractor shall supply a minimum of one (1) crew, with all necessary equipment and labor for each CTDOT Maintenance District awarded, to meet the expected volume of work. The geographical limits of each CTDOT Maintenance District are outlined in Attachment 1- DOT Maintenance Districts Map. The Contractor may be required to perform in multiple CTDOT Maintenance Districts simultaneously, if awarded. A crew is defined as one (1) foreman and the appropriate number of laborers, commercial drivers, non-commercial drivers, certified equipment operators and traffic control personnel to meet the requirements specified herein. The exact number of Contractor personnel shall be discussed and agreed upon during the pre-construction meeting

Post-Bid

Roads / Highways

$200,000.00

Public - State/Provincial

Paving, Site Work

3

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
527
Active Projects
279
Bidding Soon
4,467
All Active Projects
2,090
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2024

September 2, 2024

img_map_placeholder

Multiple Locations, Hartford, CT

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.