BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2024 at 7:00 PM

Updated November 27, 2024

Site work for a road / highway in Hartford, Connecticut. Completed plans call for site work for a road / highway.

Contractor shall provide the complete-in-place installation and removal (if specified) of metal beam guide rail, including transitional guide rail at fixed objects and/or bridge parapets, box beam, Merritt Parkway guide rail, 3-cable guide rail and impact attenuation systems at various locations within the State of Connecticut for the Client Agency. Contractor must furnish all labor, equipment, tools, materials, fittings, maintenance and protection of traffic, traffic control when specified, including uniformed flaggers, police and Truck or Trailer Mounted Attenuators, all signs, barricades, and devices erected, re-erected, maintained and removed by Contractor to perform the requested work.

Award

Roads / Highways

$18,000,000.00

Public - State/Provincial

Site Work

74

5

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
934
Active Projects
470
Bidding Soon
7,162
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2024

September 13, 2024

Project location map

Multiple Locations, Hartford, CT


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.