Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 21, 2025 at 8:00 PM
Updated May 22, 2025
Site work, paving, outdoor lighting, new construction and renovation of a mixed-use development in Hartford, Connecticut. Working plans call for the renovation of a 11,300-square-foot, three-story above grade museum; for the construction of a 6,500-square-foot museum; for outdoor lighting for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and for site work for a sidewalk / parking lot.
*As of May 21, 2025, project is currently on-hold. The owners are still re-evaluating everything including the procurement of a new GC. Although not yet firm, this project could move forward this coming June 2025, and construction could start towards the end of the year. This project will renovate the Charter Oak Cultural Center and add additional classroom space. Exterior restoration includes masonry restoration, window and door restoration, fence restoration, and new main exterior entry stair restoration. Historic Preservation includes: decorative stenciling, cast iron fencing, window restoration, and masonry restoration. Sitework includes a new 6,500sf architectural precast stepped amphitheater, unit paver areas, site concrete and retaining walls, a new rear exterior entry/egress ramp, new utilities to the building, site lighting, and all associated paving. Architectural Stone, LLC General Contracting invites you to bid on this project which includes the complete renovation and restoration of a 11,300 3-story existing synagogue building into a new cultural/music education center. Work includes a new kitchen, gallery spaces, (3) classrooms, instrument storage areas, restrooms, concessions area, stage extension, riser seating area, a control booth, a new set of interior metal pan stairs, new MEPFP systems, and a new 2-stop wheelchair lift to access the choir loft. Special Considerations: 1. This project is tax exempt. 2. This project is state funded and requires Prevailing Wage Rates based on Connecticut Department of Labor Wage and Workplace Standards 3. Certified payroll 4. This project must meet all requirements of CHRO, DECD & CIF 5. This project requires the following: 5% Retainage 5% Bid Bond for contracts exceeding $50,000 100% Performance Bonds for contracts exceeding $25,000 100% Labor & Material Payment Bonds for contracts exceeding $100,000 6. Insurance State of CT shall be listed as additional insured under the following coverages i. Commercial General Liability $1M per occurrence ii. General Aggregate - $2M iii. Umbrella Liability If it is provided to the grantee The "Hold Harmless" Indemnification endorsement shall include the interest of the municipality and the State of CT. The contractor and subcontractors and other interests. shall be so named
Final Planning
Museum
$6,500,000.00
Public - City
New Construction, Outdoor Lighting, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 27, 2025
December 1, 2025
21 Charter Oak Ave, Hartford, CT
Related To This Project
Hartford, CT
Bid Date: Jul 29 2024
Hartford, CT
Bid Date: Jul 25 2024
Hartford, CT
--
Hartford, CT
Bid Date: Oct 09 2024
Hartford, CT
Bid Date: Aug 01 2024
Hartford, CT
--
Hartford, CT
Bid Date: Aug 14 2024
Hartford, CT
Bid Date: Sep 03 2025
Hartford, CT
Bid Date: Dec 31 2024
Hartford, CT
Bid Date: Jul 10 2024
Hartford, CT
Bid Date: Jul 23 2024
Hartford, CT
Bid Date: Jul 29 2024
Hartford, CT
Bid Date: Jul 11 2024
Hartford, CT
Bid Date: Jul 18 2024
Hartford, CT
Bid Date: Jun 24 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
