BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2024 at 8:00 PM

Updated August 16, 2024

Site work and paving for a road / highway in Soperton, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Resurfacing of Boiling Springs Church Road, Red Bluff Church Road, and Deer Run Road. The Contractor shall perform all work as specified or indicated in the contract documents for the completion of the project generally described as 2024 LMIG Road Improvement Project. The project consists of resurfacing and striping on Boiling Springs Church Road, Deer Run Road and Red Bluff Church Road. The project scope is shown on the documents as prepared by WSP USA Environment & Infrastructure, Inc. The Owner shall not be liable to the Contractor for any neglect, default, delay, or interference of or by any other contractor, nor shall any such neglect, default, delay, or interference of any other contract or alteration which may be required in the Work, release the Contractor from the obligation to finish the work within the time allowed. Any questions regarding the project scope, documents and/or specifications must be submitted in writing no later than seven (7) days prior to the bid date. A written response, if required, will be provided to all known bidders in the form of written addenda. All addenda so issued shall become a part of the contract documents. Submit all technical questions to: Michael Thomas, PE WSP USA Environment & Infrastructure, Inc. 1075 Big Shanty Road, NW - Suite 100 Kennesaw, GA 30144 Phone: (478) 733-4739 Email: michael.l.thomas@wsp.com Bid Date 08/02/2024 at 12:00 PM ET 580 E 15TH ST UPLAND, CA 91786 Striping, if applicable, all work below should be included in the pay items provided. Pavement markings as noted in the LMIG PROJECT REPORT sheets(s) or typical section sheet(s) of this contract will be required. All other existing pavement markings (school zone, railroad, stop bar symbol, words, etc.) shall be replaced in accordance with Section 150. All pavement striping along the centerline shall conform to the existing striping configuration unless agreed to otherwise. The Contractor shall submit a Striping Plan at the Preconstruction Meeting. Pass/DO NOT Pass signs shall being used while temporary striping is in place.

Award

Roads / Highways

$767,152.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
48
Bidding Soon
535
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2024

October 1, 2024

Project location map

Multiple Locations, Soperton, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.