BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Jackson Township, Missouri. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Proposed Work Includes: construction of a 75 Foot Single Span Prestressed Concrete Box Beam Bridge, Approach Roadway Work, and Any Incidental Work in Accordance With the Plans and Specification. The Project is Located on South 244th Road, in Section 26, Township 32 N, Range 21 W, Polk County, Missouri Over Little Wilson Creek. All Labor Used in the Construction of This Public Improvement Shall Be Paid a Wage No Less Than the Prevailing Hourly Rate of Wages of Work of a Similar Character in This Locality as Established by the United States Department of Labor Federal Wage Rate, or by the Missouri Department of Labor and Industrial Relations State Wage Rate, Whichever is Higher. The Polk County Commission Hereby Notifies All Bidders That It Will Affirmatively Ensure That in Any Contract Entered Into Pursuant to This Advertisement, Businesses Owned and Controlled by Socially Economically Disadvantaged Individuals Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. All Bidders Must Be on Modot's Qualified Contractor List Per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2024 Edition Including All Revisions. The Contractor Questionnaire Must Be on File 7 Days Prior to Bid Opening. Contractors and Subcontractors Who Sign a Contract to Work on Public Works Projects Shall Provide a 10-hour Osha Construction Safety Program, or Similar Program Approved by the Department of Labor and Industrial Relations, to Be Completed by Their on-site Employees Within Sixty 60 Days of Beginning Work on the Construction Project. A Certified Cashier's Check or a Bid Bond in the Amount of 5% Shall Be Submitted With Each Proposal. The Polk County Commission Reserves the Right to Reject Any or All Bids. The Project Will Be Awarded to the Lowest, Responsive, Responsible Bidder. No 2nd Tier Subcontracting Will Be Allowed on This Project.

Award

Bridges / Tunnels

$508,016.00

Public - County

Demolition, New Construction, Paving, Site Work

24

6

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
53
Bidding Soon
635
All Active Projects
276
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 2, 2024

September 2, 2024

May 31, 2025

img_map_placeholder

S 244th Rd, Jackson Township, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.