Site work for a development in Berkeley, California. Conceptual plans call for site work for a development.

As of July 24, 2025, a general contractor has been awarded. The estimated start date for construction is November 1, 2025. The name of the general contractor is International Association for Human Values (IAHV), Green Pocket Forest - Berkeley, CA. *The closed solicitation has been included below for reference: For questions concerning the anticipated work, or scope of the project, please contact Thomas Dodge, Senior Forestry Supervisor, via email at tdodge@berkeleyca.gov no later than Monday, August 12, 2024. a. The contract is anticipated to begin in the fall/winter of 2024. b. The proposal shall include three years of maintenance to ensure establishment of the installed plants and avoid establishment of weeds and/or any other adventitious plants that naturally occur in the delineated areas. c. The planting palette shall consist of species of trees, shrubs, and plants that are native to Berkeley and the surrounding region, unless otherwise stated. A list of the plants being proposed for installation shall be submitted with the proposal. d. Existing trees shall be incorporated into the design. e. Proposals shall include a plan of the overall design. This includes the irrigation and planting plans, paths to allow some access through the forests, and educational signage describing Miyawaki forests and plant identification. f. The site on the west side of the BART tracks must design around the existing Here/There signs. This shall include a border delineating where no plants will be installed within a minimum of fifteen feet north and east of the Here sign and south and east of the There sign. The area between the signs shall be planted with plants that mature at a height of no more than eighteen inches, and a border shall be installed delineating where no plants shall be installed within a minimum of six feet of the front or west end of the signs. g. The site on the east side of the BART tracks shall be designed to preserve the existing redwood trees and incorporate redwood forest understory plants within the canopies of the existing trees. h. Include a plan for coordinating community involvement into the installation process. i. Include a separate price estimate for each site and a time estimate for the installation process for each site.

Conceptual

Conservation and Development

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
496
Active Projects
199
Bidding Soon
3,012
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2025

Project location map

Multiple Locations, Berkeley, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.