BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 10, 2024 at 8:00 PM

Updated November 7, 2025

Site work for a water / sewer project in Peru, Nebraska. Completed plans call for site work for a water / sewer project.

2024 Storm Sewer Improvements. Est. Value Notes: Groups A & B $883,000 Description: Group A: Replacement of 36" CMP storm sewer system located near the northeast corner of the Peru State College AWAC facility. Improvements generally consist of new 36" PP storm sewer, new concrete manholes, and restoration of all areas disturbed during construction activities. Group B: Improvements to the existing sanitary sewer system on campus including cleaning pipe, replacing damaged pipe, installing cured-in-place liners, adjusting manholes, and televising. Question Deadline 08/08/2024

Award

Water / Sewer

$769,927.00

Public - State/Provincial

Site Work

27

18

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
91
Bidding Soon
948
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

September 16, 2024

Project location map

Multiple Locations, Peru, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.