Site work and paving for a mixed-use development in Winona, Minnesota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Center Street Project. Work will consist of removal of existing concrete curbing, bollards and lighting. Grading, erosion control, utility installation, stormwater construction, and new construction of streets, parking lots, sidewalks and landscaping. Site Address: Center Street Question Deadline 07/30/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows Jim Lundberg at Point of Beginning, Inc. jiml@pobinc.com Questions received less than seven days prior to the date for opening of Bids may not be answered. A pre-bid conference will not be conducted for this Project. A certified check, cashier's check, or bidder's bond shall accompany each bid in the amount of five percent (5%) of the bid made payable to the Port Authority of Winona which shall be forfeited to the Port Authority of Winona in the event the successful bidder fails to enter into a contract with the Port Authority. The contractor shall furnish the owner, within ten (10) days after the contract is awarded, a bond executed by a surety company approved by the owner in the full amount of the contract and conditioned as provided by the General Statutes of this State. The bond shall be executed by a surety company authorized to do business within the State of Minnesota and having a minimum A.M. best rating of B+. The term of the bond will be two (2) years from the date of final acceptance. The Port Authority reserves the right to reject any or all bids and to waive informalities. Est. Completion Date: Oct. 18, 2024. All work within the easterly parking lot, excluding the wear course of asphalt, from Center Street to Lafayette Street, shall be completed by October 18, 2024. All remaining work shall be substantially completed by June 1st, 2025. Description: This project consists of reconstruction of a portion of Center Street including some Watermain, Sanitary Sewer lateral installation, R.C.P. storm sewer, Underground Storm water Management System installation, bituminous pavement, concrete sidewalks and concrete curb and gutter.

Award

Sidewalks / Parking Lot

$704,671.00

Public - City

Paving, Site Work

11

11

4

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
19
Bidding Soon
356
All Active Projects
135
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2024

September 5, 2024

img_map_placeholder

Center St, Winona, MN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.