BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2026 at 8:00 PM

Updated March 12, 2026

Site work and paving for a road / highway in Free Soil, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

10.11 mi of hot mix asphalt wedging, single chip seal, fog seal, and permanent pavement markings on Custer Road from the north village limits of Custer to the south village of limits Free Soil, Mason County. This is a Local Agency project. Question Deadline 02/27/2026 All inquiries concerning the plans and proposal for this project are to be directed to: Michael Seling Rural Staff Engineer MDOT-eProposal@Michigan.gov To be able to process and distribute an addendum, if required, all inquiries shall be made at least seven (7) calendar days before the letting. 0% Sbp Participation Required Net classification required for this project is 1730 Cb In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ca. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. MIDOT - 2603 016 - Hot Mix Asphalt Wedging, Single Chip Seal, Fog Seal, and Permanent Pavement Markings on Custer Road

Award

Roads / Highways

$1,852,936.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
0
Bidding Soon
227
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2026

May 5, 2026

Project location map

N Custer Rd, Free Soil, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.