Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 18, 2024 at 8:00 PM
Updated July 19, 2024
Demolition, site work, paving and new construction of a bridge / tunnel in Port Angeles, Washington. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The bridge is located on Center Road 0.4 miles north of the junction with Highway 101 in Quilcene. The structurally deficient bridge is load restricted for single unit vehicles. Replace current structure with a multi-span concrete slab bridge on drilled shafts. County: Jefferson Agency: Jefferson Co. Total Project Length: 0.090 Begin Termini : 14.55 End Termini : 14.70 As of July 18, 2024, the project is in Conceptual status. Anticipated letting year is 2025. WADOT - Little Quilcene River Bridge Replacement *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as become available.
Conceptual
Bridges / Tunnels
$5,623,900.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 1, 2025
US-101, Port Angeles, WA
Related To This Project
Port Angeles, WA
Bid Date: Aug 13 2024
Port Angeles, WA
--
Port Angeles, WA
Bid Date: Aug 05 2024
Port Angeles, WA
Bid Date: Aug 05 2024
Port Angeles, WA
Bid Date: Aug 28 2024
Port Angeles, WA
Bid Date: Sep 19 2024
Port Angeles, WA
Bid Date: Oct 10 2024
Port Angeles, WA
Bid Date: Mar 31 2025
Port Angeles, WA
--
Port Angeles, WA
Bid Date: Aug 12 2024
Port Angeles, WA
Bid Date: Jul 31 2024
Port Angeles, WA
Bid Date: Aug 11 2021
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
