BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for an educational facility in San Diego, California. Working plans call for site work for a educational facility.

Responses to Request for Proposals (RFP) Lease-Leaseback (LLB)* *This is a LLB project. Only LLB Prime Contractors listed below may submit proposals to the San Diego Unified School District. • Balfour Beatty Construction, LLC • Bernards Bros, Inc. • Core West, Inc. • C.W. Driver, LLC • Erickson – Hall Construction Co. • Flint Design Build, LLC dba Flint • PCL Construction Services, Inc. • Soltek Pacific Construction Company • Sundt Construction, Inc. • Swinerton Builders • Turner Construction Company Notice is hereby given that the San Diego Unified School District, acting by and through its governing board, will electronically receive proposals for the furnishing of all labor, materials, transportation, equipment, and services for: CONSTRUCTION SERVICES FOR PARADISE HILLS ELEMENTARY SCHOOL Whole Site Modernization - LB25-0181-08-00-G1 (GMP No. 1) Joint Use Field - LB25-0181-08-00-G2 (GMP No. 2) Solar Photovoltaic - LB25-0181-08-00-G3 (GMP No. 3) (LEASE-LEASEBACK) Site visit info : FOR THE SAFETY OF OUR STUDENTS, PROPOSERS MUST ABIDE BY THE FOLLOWING: o Photographs: when taking pictures of the site, please make sure students are not in the frame. o Restrooms: please use a "staff only" restroom - student restrooms are not open to adults. o Conduct: when walking through the campus, stay together as a group and keep your voices down. Class is in session. o Leaving the walk before it has concluded: if you need to leave the site walk before it has ended, locate the contract specialist or other District staff, and they will escort you to the nearest exit. The project's contract numbers, estimates, and anticipated durations are as follows: A. Construction - Paradise Hills Elementary School - Contract Number LB25-0181-08-00-G1 - WSM Twenty-Three (23) months with construction beginning October 2024 - February 2026 Construction estimate is $27,423,967.00 B. Construction - Paradise Hills Elementary School - Contract Number LB25-0181-08-00-G2 - JUF Six (6) months with construction beginning October 2024 - March 2027 Construction estimate is $2,792,065.00 C. Construction - Paradise Hills Elementary School - Contract Number LB25-0181-08-00-G3 - Solar PV Two (2) months with construction beginning October 2024 - August 2025 Construction estimate is $996,825.00 Paradise Hills School Whole Site Modernization (CONSTRUCTION) – Division 1-33 – DSA # 04-121567 • 03 30 00 Cast-In-Place Concrete • 08 71 00 Door Hardware • 11 68 16 Play Structures • 28 13 00 Access Control • 28 46 21.11 Addressable Fire-Alarm Systems • 32 18 13 Synthetic Grass Surfacing • 32 84 00 Planting Irrigation Paradise Hills School Joint Use Field (CONSTRUCTION) – Division 1-33 – DSA # 04-122959 • 03 30 00 Cast-In-Place Concrete • 08 71 00 Door Hardware • 32 84 00 Planting Irrigation Paradise Hills School Solar Photovoltaic (CONSTRUCTION) – Division 1-33 – DSA # 04-123619 • 03 30 00 Cast-In-Place Concrete If allowed, refunds will be processed by the District only if the Documents, including addenda, are returned intact and in good order to Crisp Imaging within ten (10) days of the issuance of the Final Results on the day after Board Award (October 22, 2024). Crisp Imaging is located at 8375 Camino Santa Fe, Unit B, San Diego, CA 92121, or call (858) 535-0607.

Final Planning

Educational

$27,423,967.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
25
Bidding Soon
617
All Active Projects
283
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

October 21, 2024

img_map_placeholder

5816 Alleghany St, San Diego, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.