BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 14, 2025 at 8:00 PM

Updated July 18, 2025

Site work for a water / sewer project in Port St Joe, Florida. Completed plans call for site work for a water / sewer project.

The work consists of the placement of approximately 830,000 cubic yards of beach compatible sand obtained from an offshore borrow area located offshore of St. Joseph Peninsula, Gulf County, Florida to renourish 1.1 miles of beach which includes the partial replacement of the dune. The beach fill will be placed between DEP Monuments R-100 to R-105.8 (~1.1 miles). The work also includes the construction of eight (8) submerged breakwaters between DEP R-101 and R-105. The work shall additionally include the supply and installation of approximately 118,000 native dune plants. The work will be completed and ready for final payment within 180 calendar days after the date of Notice to proceed (anticipated by November 1st) as indicated in the agreement. It is the goal to have the project completed by May 1, 2025. All bids must be made on the required bid forms. All blank spaces for bid prices must be filled in, in ink or typewritten, and the bid form must be fully completed and executed when submitted. The bid forms listed in the section 2. Bid forms of the instructions to bidders shall be completed, in full, items are required to be submitted as part of the bid for this project. The gulf county board of county commissioners reserves the right to accept or reject any and all bids in whole or in part, to waive informalities in the bidding or bidding documents, to obtain new bids, or to postpone the bid opening. Un-successful bids shall be valid for 30 days after the bid opening. Question Deadline 07/10/2025 All questions about the BIDDING DOCUMENTS are to be submitted to ENGINEER in writing.no less than seven (7) days prior to the date for receipt of BID in the INSTRUCTION TO BIDDERS. The project is located along the gulf front of St. Joseph Peninsula, Gulf County, Florida. The project consists of the construction of a beach nourishment project between DEP R-100 and R-105.8 (~6,000 feet; ~1.1 miles; ~1,800 meters). The project consists of the placement of clean white beach compatible sand totaling 830,000 Cubic Yards from an offshore borrow source. Eight (8) submerged breakwaters shall also be constructed between R-101 and R-105.5 within the limits of the proposed beach nourishment project. Approximately 118,000 native dune plants will also be installed within the limits of the proposed dune.

Post-Bid

Water / Sewer

$33,000,000.00

Public - County

Site Work

26

27

2

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
43
Bidding Soon
498
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2025

September 1, 2025

Project location map

Multiple Locations, Port St Joe, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.