BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of a road / highway in Riverside, California. Completed plans call for the renovation of a road / highway; and for site work for a road / highway.

**As of October 11, 2024 This project has been awarded to All American Asphalt, with the awarded amount of $6,706,022.50.** The project entails street maintenance improvements throughout the City of Riverside on two minor streets in a residential location; on three minor streets in an industrial location; one major collector street, Jefferson Street (Magnolia Avenue to Lincoln Avenue); on five arterial streets including Martin Luther King Boulevard (Kansas Avenue to Chicago Avenue), Sycamore Canyon Boulevard (215 freeway to Core Apartments), Mission Grove Parkway (Trautwein Road to Alessandro Boulevard), Tyler Street (Jurupa Avenue to Verona Street), Jurupa Avenue (Tyler Street to Crest Avenue; and construction of a new median on Jurupa Avenue. This project generally includes, but is not limited to, the resurfacing of deteriorated pavement with DGAC and ARAM treatment; reconstructing damaged concrete sidewalks, driveways, pedestrian ramps, new bus pads, cross gutters, curbs, and gutters; adjustment of valve covers and manholes; and replacement of traffic striping, signs, and detector loops, new median landscaping, and irrigation. Online Q&A: Yes Q&A Deadline: 07/30/2024 2:00 PM (PDT) Estimated Bid Value: $7,565,785.50 PROJECT BACKGROUND AND DESCRIPTION As part of citywide street improvements, Converse Consultants cored/drilled at 4 locations (attached in Appendix A, taken from the Pavement Coring and Laboratory Test Report dated June 9, 2023) dated May 11, 2023, along the Sycamore Canyon Boulevard within the project limits. Existing pavement thicknesses (AC/AB) were measured at each location, bulk soil samples were obtained for moisture determination and R-value tests. Moderate and severe alligator cracking was observed throughout the street. We understand the city intends to reconstruct this segment of the Sycamore Canyon Boulevard by overlaying with asphalt concrete over cement stabilized pulverized base. Description. Traffic signal and electrical work is to be performed at the following locations: 1. Sycamore Canyon Boulevard and Route 215 Freeway Ramp (TS-MOD) 2. Martin Luther King Boulevard and Kansas Avenue (XL-891) 3. Martin Luther King Boulevard and Ottawa Avenue (XL-891) 4. Martin Luther King Boulevard and Chicago Avenue (XL-891) 5. Mission Grove Parkway S and Trautwein Road (XL-894) 6. Mission Grove Parkway S and Mission Village Drive (XL-894) 7. Mission Grove Parkway S and Mission Grove Shopping Center (XL-894) 8. Mission Grove Parkway S and Alessandro Boulevard (XL-894) 9. Jefferson Street and Magnolia Avenue (XL-895) 10. Jefferson Street and Indiana Avenue (XL-895)

Award

Roads / Highways

$6,706,023.00

Public - City

Renovation, Site Work

42

15

5

Subscribe For Documents

67 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
104
Bidding Soon
2,260
All Active Projects
1,021
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2024

October 14, 2024

img_map_placeholder

Multiple Locations, Riverside, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.