BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a pipeline in Fayetteville, North Carolina. Completed plans call for site work for a pipeline.

All questions about the meaning or intent of the bid or Contract Documents shall be submitted in writing to Carla Wint, Procurement Advisor, by email to procurement@faypwc.com. In order to receive consideration, questions must be received by Tuesday, July 30, 2024, 4:00 p.m. Deadline for Questions from Bidders 1 5:00 P.M., Wednesday, September 4, 2024 Questions regarding this bid must be submitted in writing to the attention of Carla Wint, Procurement Advisor, by email to procurement@faypwc.com. BWGP utilizes high-pressure natural gas as the primary fuel for its eight (8) gas turbines. This project aims to relocate existing buried gas lines above grade to an existing pipe rack. These lines, which have been in the ground since the 1980s, are experiencing corrosion that has resulted in leaks. In the 1990s, a segment of the gas line was redirected to the pipe rack during the construction of the TES system Currently, two (2) gas turbines are fed from this line, while three (3) additional units have drop connections that are not yet operational. We will install three (3) more drops, bringing the total to five (5) connected units. The scope includes: o Extending the main 12-inch pipeline, maintaining the same wall thickness as the existing line, approximately 600 feet to supply the rear units. o Installing a low-point drain at the end of the line. o Installing a 12-inch isolation valve prior to the last three units. The license classification shall be: Part 1: General Contractor - Unlimited Certified Welding Contractor - Unlimited Fayetteville Public Works Commission reserves the right to reject any or all bids for any reason determined by PWC to be in its best interest, or to award the bid to the lowest responsible bidder or bidders, taking into consideration quality, performance, and the time specified in the bids for the performance of the contract. Please email the FSU CRO to make an appointment: fsucro@uncfsu.edu. Performance and Payment Bonds are required in the amount of 100% of the Contract amount and shall be furnished by the Contractor. Each bid shall be accompanied by a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the Contract in accordance with the bid bond and upon failure to forthwith make payment, the surety shall pay the obligee an amount equal to the amount of said bond. Said deposit shall be retained by the Owner as liquidated damages in event of failure of the successful bidder to execute the Contract within ten (10) days after the Notice of Award or give satisfactory surety as required by law. Liquidated Damages: Insert amount $1,000.00 per day for each day beyond the Final Completion Date

Post-Bid

Pipeline

$2,000,000.00

Public - City

Site Work

6

3

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
136
Bidding Soon
1,963
All Active Projects
829
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 10, 2024

June 30, 2025

June 25, 2026

img_map_placeholder

2274 Custer Ave, Fayetteville, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.