Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and renovation of an educational facility in San Diego, California. Completed plans call for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.
Painting of interior of classrooms 802, 803 and 804 per contract documents. New ACT acoustical ceiling tiles, new acoustical wall mounted panels, new light fixtures, reinforcement of storefront walls, installation of Wenger instrument storage (ofci) and demolition of existing cabinet storage, white boards and other items. Rerouting of existing electrical raceways to accommodate installation of instrument storage and acoustical wall mounted panels. The scope of work includes, but is not necessarily limited to, furnishing all labor, materials, accessories, appliances, tools, equipment, facilities, transportation, applicable taxes and services necessary for, and incidental to, performing all operations in connection with the specification sections listed below, complete as indicated on the drawings and specifications or incidental to the requirements of this Bid Package Contractor and/or specified herein, unless specifically excluded. M/WBE's are encouraged to participate in the bid process. The Work of this Contract consists of the following: Painting of interior of classrooms 802, 803 and 804 per contract documents. New ACT acoustical ceiling tiles, new acoustical wall mounted panels, new light fixtures, reinforcement of storefront walls, installation of Wenger instrument storage (ofci) and demolition of existing cabinet storage, white boards and other items. Rerouting of existing electrical raceways to accommodate installation of instrument storage and acoustical wall mounted panels. B. The scope of work includes, but is not necessarily limited to, furnishing all labor, materials, accessories, appliances, tools, equipment, facilities, transportation, applicable taxes and services necessary for, and incidental to, performing all operations in connection with the specification sections listed below, complete as indicated on the drawings and specifications or incidental to the requirements of this Bid Package Contractor and/or specified herein, unless specifically excluded. The contractor is to provide installation of Wenger Instrument Storage equipment per manufacturer recommendations included in this package. 4. Contractor shall ensure the movable/ dividing walls are in working condition and shall repair as necessary to ensure they work properly at the end of the construction. 5. Contractor shall protect existing carpet flooring and rubber base in place at all times during construction. If existing flooring is damaged it will be the contractor's responsibility to repair the damage. Question Deadline 08/05/2024 at 2:00 PM PT Questions from Bidders Due: Any questions relative to the bid shall be in writing and directed to the Purchasing Department at the address specified for receipt of bid proposals. These requests shall be submitted to the District by the date stated above in the Schedule of Events.
Bid Results
Educational
$129,000.00
Public - City
Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 14, 2024
September 10, 2024
1267 Thermal Ave, San Diego, CA
Related To This Project
San Diego, CA
Bid Date: Aug 19 2024
San Diego, CA
Bid Date: Aug 21 2024
San Diego, CA
Bid Date: Aug 23 2024
San Diego, CA
--
San Diego, CA
--
San Diego, CA
Bid Date: Aug 07 2024
San Diego, CA
Bid Date: Sep 13 2024
San Diego, CA
--
San Diego, CA
--
San Diego, CA
Bid Date: Aug 05 2024
San Diego, CA
--
San Diego, CA
Bid Date: Aug 02 2024
San Diego, CA
Bid Date: Aug 22 2024
San Diego, CA
Bid Date: Aug 16 2024
San Diego, CA
Bid Date: Aug 22 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.