BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Kirkwood, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The proposed work includes: Construction of new concrete sidewalk to comply with ADA requirements along both sides of Muldrow St, from Quisenberry to Buchanan, in the City of Mexico, MO. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the current version of the Missouri Standard Specifications for Highway Construction including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. A certified cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. The City of Mexico reserves the right to reject any or all bids. The project will be awarded to the lowest, responsive, responsible bidder. : All questions about the meaning or intent of the contract documents shall be submitted to the Design Professional in writing. Replies will be issued by written addenda to all parties on the planholder list. Only questions answered by formal written addenda will be binding. Any alternate material shall be approved prior to the bid opening and in sufficient time to issue an addendum. No alternates will be approved unless approved in a written addendum. Questions must be received by the Design Professional at least four (4) working days prior to the bid opening. No addenda will be issued less than two (2) working days prior to the bid opening The DBE Goal for this project is 5%. No 2nd tier subcontracting will be allowed on this project. MODOT - Muldrow Phase II Sidewalk Improvements All questions concerning the bid document preparation can be directed to the Project Manager at Great River Engineering at 417-886-7171. Project specific questions can be directed to the Design Professional of record at Great River Engineering

Post-Bid

Sidewalks / Parking Lot

$800,000.00

Public - City

Paving, Site Work

15

7

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
99
Bidding Soon
1,386
All Active Projects
612
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 16, 2024

September 16, 2024

December 15, 2024

img_map_placeholder

E Essex Ave, Kirkwood, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.