BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 24, 2025 at 8:00 PM

Updated September 25, 2025

Site work and paving for a mixed-use development in Sumner, Washington. Working plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and road / highway.

This project will construct a Shared Use Path paralleling Fryar Avenue from W. Main Street to Puyallup Street. Work also includes Pedestrian Scale Crossing Illumination, ADA Curb Ramps, Bicycle Wayfinding Signs/Markings, and Bridge (Part of Shared-use Path). Construction of this trail segment will complete the Sumner Link Trail, Sumner's core trail system of approximately 8 miles running from the north city limits to the south city limits. Length : 0.620 County: Pierce Agency: Sumner Begin Termini : W Main Street End Termini : Puyallup Street As of September 24 , 2025, the project is in Final Planning status. Anticipated letting Year is 2025. WADOT - Fryar Avenue Shared Use Trail *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Bridges / Tunnels

$6,212,217.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
71
Bidding Soon
1,513
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2025

Project location map

Fryar Ave, Sumner, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.