BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 4, 2025 at 7:00 PM

Updated November 5, 2025

Site work, outdoor lighting and renovation of a mixed-use development in Sumner, Washington. Design plans call for the renovation of a educational facility; for site work for a educational facility; playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

As of November 4, 2025, this project is a part of the 2024 Bond. It is currently in the design and permitting phase. Construction will take place in 2026. The 2024 bond included funding for a new field with lighting at Daffodil Valley Elementary. Project details: Adding multi-use synthetic turf field facilities for students/community Installing field lighting *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Educational

$6,000,000.00

Public - City

Outdoor Lighting, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
2
Bidding Soon
872
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.