BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Fresno, California. Completed plans call for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.

Radio Park Renovation. Services of an interpreter and additional accommodations can be made available. Requests for accommodations should be made at least five working days but no later than 48 hours prior to the scheduled meeting/event. Please contact the Procurement Specialist on the cover at 559-621- 1332 or through at online. the Questions and Answers field The City of Fresno hereby notifies all Bidders that no person shall be excluded from participation in, denied any benefits of, or otherwise discriminated against in connection with the award and performance of any contract on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, ethnicity, status as a disabled veteran or veteran of the Vietnam era or on any other basis prohibited by law. Bidders are advised that, as required by the Fresno Municipal Code, the city has established a National Targeted Worker mandatory participation level. Bidders are advised that as required by the Fresno Municipal Code, the City of Fresno is implementing new National Targeted Worker requirements for public work of improvement contracts over $200,000. The mandatory participation level for National Targeted Workers is 15%. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $1500 per Calendar Day. Project Duration Three Hundred (300) Working Days. Scope of Services The scope of work includes but is not limited to; renovation of the existing Radio Park, including construction of a new splash pad, playgrounds, restroom facilities, picnic pavilion, shade structure, amphitheater with concrete stage and overhead structure, walking paths, fencing, artwork displays, and parking lot improvements, in addition to improvement to the landscape and irrigation, playfield renovation, sidewalks, and bus stop. The City reserves the right to reject any and all bids. The Construction Allocation for this project is $6,600,000.00.

Bid Results

Playgrounds / Parks / Athletic Fields

$10,099,056.00

Public - City

Paving, Renovation, Site Work

77

18

35

8

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
24
Bidding Soon
414
All Active Projects
203
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2024

November 4, 2024

img_map_placeholder

2233 N First St, Fresno, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.