BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and outdoor lighting for a mixed-use development in San Leandro, California. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and bridge / tunnel.

The City of San Leandro is seeking one qualified firm or team to provide professional design services related to the construction of a pedestrian bridge over San Leandro Creek The City of San Leandro is seeking proposals from qualified Civil/Structural Engineering consulting firms or multi-disciplinary teams to prepare an environmental clearance document and detailed design of a replacement pedestrian bridge over San Leandro Creek connecting Cary Drive and Haas Avenue, which will also include ADA improvements to the existing sidewalk at the entrance to the bridge on Haas Avenue all in accordance with the scope of work within the request for proposals. Before the previous bridge was damaged, a single street light was positioned on a wooden pole at the end of the bridge on Cary Drive. A wooden joint utility pole with street light is also located at the end of the bridge on Haas Avenue; however, the current function of that street light is to illuminate the street, not the bridge approach. The Project will include re-establishment of lighting at the Cary Drive end of the bridge. The selected Consultant team shall also evaluate the feasibility of providing additional lighting to the bridge approach on Haas Avenue. Questions regarding the proposal shall be submitted by email to Jayson Imai, City Engineer, at jimai@sanleandro.org; please also copy Sally M. Perez, Purchasing Technician, at sperez@sanleandro.org. The City reserves the right to reject any or all proposals and the right to waive minor irregularities in any proposals. Waiver of one irregularity does not constitute waiver of any other irregularities.

Conceptual

Bridges / Tunnels

$1,000,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
89
Bidding Soon
1,880
All Active Projects
785
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2025

img_map_placeholder

Multiple Locations, San Leandro, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.