BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Santa Cruz, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of September 25 , 2024 , this project has been cancelled due to no bids received and no plan to rebid. Description of Work: Includes Restriping Ucsc Main Campus Streets, Including Center and Edge Lines, Bike Lanes on Main Streets, Refreshment of Most Crosswalks, Pavement Markings, Intersection Stop Legends With Limit Lines and Speed Bumps. Bidders May Be Required to Submit Qualifications With Their Bids as Set Forth in the Supplementary Instructions to Bidders. An Optional Site Walk Will Be Held Upon Request. If a Site Walk is Requested, All Attendees of the Pre-bid Conference Will Be Invited to Attend. For Further Information, Contact University's Representative Alex Yasbek at Ayasbek@ucsc.edu. Requests for Clarification or Interpretation of the Bidding Documents Shall Be Received No Later Than 5:00 Pm on Friday, November 22, 2024 and Addressed Only to: Alex Yasbek Ayasbek@ucsc.edu. Estimated Construction Cost: $414,828 (Base Bid). The Successful Bidder Shall Pay All Persons Providing Construction Services and/or Any Labor on Site, Including Any University Location, No Less Than the Uc Fair Wage ($15 Per Hour) and Shall Comply With All Applicable Federal, State and Local Working Condition Requirements.

Sub-Bidding

Roads / Highways

$414,828.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
66
Bidding Soon
1,296
All Active Projects
541
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2024

January 6, 2025

img_map_placeholder

Multiple Locations, Santa Cruz, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.