Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a stadium in West Kelowna, British Columbia. Completed plans call for the renovation of a stadium.
The project's general intent is to implement several energy conservation measures (ECMs) described below in four phases. Phase 1: Control Modifications and Upgrades, and Pre-Retrofit TAB. a. Royal LePage Boiler Staging and Control Modifications. b. Royal LePage Dehumidification Control Modifications. c. Jim Lind Heating Plant BAS Integration. d. Testing and balancing of the specific existing pumps to confirm current flow rates. Submit written report to Consultant. Proposed Phase 1 Schedule: Commencement of Construction: By October 1, 2024 Substantial Completion: By November 30, 2024 Phase 2: Royal LePage Heat Pump Retrofit a. Replacing the existing modular heat pump in the Royal LePage Arena Mechanical Room with a 120-tons screw heat recovery chiller. b. Royal LePage Existing Piping Insulation. Proposed Phase 2 Schedule: Commencement of Construction: By November 30, 2024 Substantial Completion: By August 1, 2025 Phase 3: Jim Lind Heat Pump & Desuperheater Retrofit a. Provide a new 20-tons heat recovery chiller c/w associated pumps and integrate to the existing condenser and heating systems of the Jim Lind Arena. b. Provide a new desuperheater and connect to the refrigeration plant to preheat the Zamboni hot water for the Jim Lind Arena. Proposed Phase 3 Schedule: Commencement of Construction: By January 1, 2025 Work Restriction: Shut down of the refrigeration plant is limited to June 1, 2025 to July 1, 2025. Substantial Completion: By August 1, 2025 Phase 4: Jim Lind Low-Temperature Heaters Retrofit a. Replacement of existing baseboard and force flow heaters in the Jim Lind Arena. Proposed Phase 4 Schedule: Commencement of Construction: Within 60 days after notice to proceed with this phase. Start of phase is dependent on winter trend data received for the Jim Lind Heating Systems after completion of Phase 1. Notice to proceed with this phase is anticipated by March 30, 2025. Substantial Completion Date: August 1, 2025. Documents can be obtained from https://westkelowna.bidsandtenders.ca/
Post-Bid
Arenas / Stadiums
$1,000,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 29, 2024
October 1, 2024
2760 Cameron Rd, West Kelowna, BC
Related To This Project
West Kelowna, BC
Bid Date: Aug 13 2021
West Kelowna, BC
Bid Date: Mar 14 2019
West Kelowna, BC
--
West Kelowna, BC
Bid Date: Sep 12 2024
West Kelowna, BC
Bid Date: Oct 03 2024
West Kelowna, BC
Bid Date: Oct 10 2024
West Kelowna, BC
--
West Kelowna, BC
--
West Kelowna, BC
--
West Kelowna, BC
--
West Kelowna, BC
Bid Date: Jul 23 2024
West Kelowna, BC
Bid Date: Aug 01 2024
West Kelowna, BC
--
West Kelowna, BC
Bid Date: Jun 19 2024
West Kelowna, BC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.