BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a stadium in West Kelowna, British Columbia. Completed plans call for the renovation of a stadium.

The project's general intent is to implement several energy conservation measures (ECMs) described below in four phases. Phase 1: Control Modifications and Upgrades, and Pre-Retrofit TAB. a. Royal LePage Boiler Staging and Control Modifications. b. Royal LePage Dehumidification Control Modifications. c. Jim Lind Heating Plant BAS Integration. d. Testing and balancing of the specific existing pumps to confirm current flow rates. Submit written report to Consultant. Proposed Phase 1 Schedule: Commencement of Construction: By October 1, 2024 Substantial Completion: By November 30, 2024 Phase 2: Royal LePage Heat Pump Retrofit a. Replacing the existing modular heat pump in the Royal LePage Arena Mechanical Room with a 120-tons screw heat recovery chiller. b. Royal LePage Existing Piping Insulation. Proposed Phase 2 Schedule: Commencement of Construction: By November 30, 2024 Substantial Completion: By August 1, 2025 Phase 3: Jim Lind Heat Pump & Desuperheater Retrofit a. Provide a new 20-tons heat recovery chiller c/w associated pumps and integrate to the existing condenser and heating systems of the Jim Lind Arena. b. Provide a new desuperheater and connect to the refrigeration plant to preheat the Zamboni hot water for the Jim Lind Arena. Proposed Phase 3 Schedule: Commencement of Construction: By January 1, 2025 Work Restriction: Shut down of the refrigeration plant is limited to June 1, 2025 to July 1, 2025. Substantial Completion: By August 1, 2025 Phase 4: Jim Lind Low-Temperature Heaters Retrofit a. Replacement of existing baseboard and force flow heaters in the Jim Lind Arena. Proposed Phase 4 Schedule: Commencement of Construction: Within 60 days after notice to proceed with this phase. Start of phase is dependent on winter trend data received for the Jim Lind Heating Systems after completion of Phase 1. Notice to proceed with this phase is anticipated by March 30, 2025. Substantial Completion Date: August 1, 2025. Documents can be obtained from https://westkelowna.bidsandtenders.ca/

Post-Bid

Arenas / Stadiums

$1,000,000.00

Public - City

Renovation

23

19

5

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
28
Bidding Soon
296
All Active Projects
97
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 29, 2024

October 1, 2024

img_map_placeholder

2760 Cameron Rd, West Kelowna, BC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.