BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2024 at 8:00 PM

Updated August 23, 2024

Site work and paving for a mixed-use development in Niles, Ohio. Working plans call for site work for a road / highway; and for paving for a road / highway.

As of 8/22/2024 There were no bids received. The work to be performed consists of asphalt pavement improvements to the Niles Greenway Multi-Use Trail between Ruppell Road and McKees Lane. Work includes tree removal, tree root removal with full depth asphalt pavement removal & replacement, and asphalt pavement overlay. Total project length is 2,240' with an average asphalt surface width of 10'. Each bidder shall be required to complete and file with his bid the enclosed Proposal Guaranty and Performance/Payment Bond Form (Section 153.571 of the Ohio Revised Code) with a Surety Company executing the Bond, which is listed on the Treasury Department's most current list (Circular 570 as amended) and authorized to transact business in the State where the project is based. (A) A Contract Performance Bond in an amount equal to 100% of the estimated cost of the work conditioned, among other things that the Contractor will perform the work upon the terms proposed, within the time prescribed, in accordance with the plans and specifications. (B) A Payment Bond in an amount equal to 100% of the estimated cost of the work conditioned for the payment by the Contractor and all Sub-contractors for labor performed and materials famished in connection with the project involved. This Project Shall Be Completed by October 15, 2024. The City of Niles reserves the right to reject any or all bids and waive any informalities in bidding.

Final Planning

Roads / Highways

$117,342.00

Public - City

Paving, Site Work

21

8

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
105
Bidding Soon
2,153
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2024

September 20, 2024

Project location map

Niles Greenway, Niles, OH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.