BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Winnipeg, Manitoba. Completed plans call for the renovation of a residential development.

The contractor will be responsible for purchasing, installation, and providing customer service after the installation throughout the project. The following heat pumps with the provided capacity are needed: a) Cold Climate Air Source Heat Pump, ducted system, 4-ton capacity, for installation at 453 Carpathia. b) Air Source Heat Pump, ducted system, 2-ton capacity, for installation at 440 Grenadier c) Air Source Heat Pump only coil system, ducted system, 1.5-ton capacity, for installation at 190 Ubique. This unit has been intentionally sized for cooling. d) Cold Climate Air Source Heat Pump, ducted system, 4-ton capacity, for installation at 448 Grenadier. e) Cold Climate Air Source Heat Pump, ducted system, 3-ton capacity, for installation at 452 Grenadier. Question Acceptance Deadline: 2024/08/12 04:00:00 PM CDT Any Vendor questions may be submitted to the Bonfire Vendor Discussion online, No telephone, facsimile, email, or verbal inquiries will be responded to or entertained. All questions and corresponding answers which RRC Polytech reasonably deems to be of interest to all Vendors may be shared with all Vendors. All documents, Vendor Q&A, and quote submissions can be found at the following link on RRC Polytech's tendering site, run by Bonfire: https://rrc.bonfirehub.ca/projects/82974/details

Post-Bid

Residential Subdivision

$200,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
9
Bidding Soon
225
All Active Projects
84
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2024

September 23, 2024

img_map_placeholder

Multiple Locations, Winnipeg, MB

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.