BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2025 at 7:00 PM

Updated February 7, 2025

Site work for a water / sewer project in Avondale, Arizona. Design plans call for site work for a water / sewer project.

As of February 6, 2025, a design firm has been selected for the project. Construction is estimated to start late 2025. *The closed solicitation has been included below for reference: The City of Avondale (the "City") is issuing this Request For Qualifications (this "RFQ") seeking statements of qualifications ("SOQ") from qualified, licensed firms ("Vendors") interested in providing Avondale Dysart Road Sewer Replacement Phase II Design Services (the "Services"), as more particularly described in the Scope of Work. The construction of the Avondale Dysart Road Sewer Replacement Phase II may be completed through a Design-Bid-Build ("DBB") project delivery method. The procurement for the ("DBB") will be solicited separately. In accordance with the City's Procurement Code, the City will accept sealed SOQ for the Services specified in the Scope of Work. The City intends to engage the service(s) of a firm having specific experience and qualifications in one or each of the areas identified in this RFQ. For consideration, SOQs for the project must provide evidence of the firm's experience and abilities in the specified area(s) and other disciplines directly related to the proposed service. Question Deadline 08/20/2024 at 1:00 AM MT Any question related to the RFQ, including any part of the Scope of Work, shall be directed only to the Question & Answers section of OpenGov. This project will design approximately 3,300 Linear Feet (LF) of Gravity Sewer to be constructed in three phases, which includes: Approximately 2,000 LF of 12-inch gravity sewer along Dysart Road from Harison Drive to the existing 15-inch sewer line in the Eliseo C Felix Jr Way alignment, just south of the retention basin as identified in Appendix A. Approximately 1,300 LF of 12-inch gravity sewer along 7th Street from Corral Street to Harrison Drive Approximately 1,000 LF of 8-inch gravity sewer on Harrison Drive from 4th Street to Dysart Road The new gravity sewer will accommodate increased sewer flow, correct slope issues on the gravity sewer in 7th Street, reverse the direction of flow in Harrison Drive, reduce maintenance issues and establish a new discharge point to the existing 15" sewer line along the Eliseo C Felix Jr Way alignment, south of the Tres Rios Landing. The city is currently proposing to use 'Design Bid Build' for the project delivery method but may consider other methods as well. Due to budget constraints, the city is requesting to complete the design in three phases and to provide bid documents for each phase so that each phase can be bid separately and potentially in separate fiscal years.

Design

Water / Sewer

$445,000.00

Public - City

Site Work

12

2

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
2
Bidding Soon
718
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2025

Project location map

Dysart Rd, Avondale, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.