BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a military facility in Hurlburt Field, Florida. Completed plans call for site work for a military facility.

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in subpart 12.6. as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued Submit Written offers only, oral offers will not be accepted. Questions Due: 9 August 2024 @13:00 All questions regarding this solicitation must be emailed to danyette.washington@us.af.mil and douglas.mcgee.1@us.af.mil4 Description of Services. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to provide and install the vinyl tent structure complete with all accessories. The tent will be installed and secured to concrete located behind the Aderholt Fitness Center, Alpha Warrior Pad. The 1 SOW FSS is looking to schedule the installation date as soon as the vendor is capable. 2. Requirements 2.1 The vinyl tent structure shall be 50' Wide X 58' Long X 23' Center Height X 15' Side wall 18 OZ. Cover. A skirt to seals the base. 2.2 The structure will include openings on each end, 15'wide x 10'high. 2.3 Material shall be flame retardant PVC Laminated fabric with polyester scrim. The STTS/RAS will be responsible to connect the main power and connection to the panel box. 2.4 The vinyl tent structure shall have a hurricane rating that meets Florida (local) building code. 2.5 The vinyl tent structure will include the appropriate Lightning Protection kit, with associated hardware, installed. 2.6 The vinyl tent structure shall include electrical and lighting, 6ea. 400watt 120volt single phase metal halide lights, "Reloc" (or equivalent plug and play light system), switches and panel box capable of receiving power from an outside source. After installation and assembly, the contractor shall inspect and test the tent structure and all utilities/accessories. The Government shall be present for this test and inspection. Acceptance of the structure will not occur until testing is complete and everything is shown to be in working order.

Post-Bid

Military

$100,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
21
Bidding Soon
437
All Active Projects
199
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2024

September 12, 2024

img_map_placeholder

To Be Determined, Hurlburt Field, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.