BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Birtle, Manitoba. Contact the soliciting agency for additional information.

Reference Number 0000275662 Question Acceptance Deadline 2024/08/09 04:30:00 PM CDT A hazardous Building Materials Assessment (HBMA) dated July 11, 2024 was prepared for both sites and is available for review. It is recommended that contractors tendering for this work, obtain and familiarize themselves with the findings and recommendations on these assessments. Copies of the HBMA are available at Prairie View Municipal Offices in Birtle and Miniota. The HBMA summary of findings states: 1. 920 St. Clare Street: Asbestos Containing Materials (ACM's) are present in the building. Lead was confirmed in select paint/surface coatings. Mercury liquids were found in the thermostat ampules. Silicia was present in the concrete and other materials such as masonry. 2. 165-171 North Railway Avenue: Asbestos Containing Materials (ACM's) are present in various areas of the building. Lead is present in the pain and surface coatings. Silica is present in the concrete and other materials such as masonry. Mercury vapor is present in lamp tubes. Visible mold was not observed. The contractor is responsible for obtaining all locates and abiding by all conditions of said locates. The contractor is responsible for erecting and maintaining a security fence around the worksite. The contractor shall follow safe work procedures and regulations when handling ACM's and mercury containing equipment and lamps, disturbing lead, silica and water damage. The contractor is responsible for properly hauling and disposing of hazardous wastes. Transporting hazardous wastes shall be in compliance with Transportation of Dangerous Regulations (TDGR). Disposing of Hazardous wastes shall be at a licensed hazardous waste facility. All materials supplied by the contractor to ensure the safety and security of the site will be considered incidental to the lump sum bid price for Abatement and Disposal of Hazardous Materials. All materials, men and equipment provided by the contractor for abatement and disposal of hazardous materials will be considered incidental to the lump sum bid price for Abatement and Disposal of Hazardous Materials. The quote provided shall be a lump sum price for Abatement and Disposal of Hazardous Materials. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Municipal

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
0
Bidding Soon
22
All Active Projects
13
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2024

September 9, 2024

img_map_placeholder

Multiple Locations, Birtle, MB

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.