BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a municipal facility in Gallipolis, Ohio. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

Gallia County Land Reutilization Corporation was awarded grant funds from the Ohio Department of Development's (ODOD) Brownfield Remediation Program to demolish eight (8) structures and remove and dispose of materials found on-site, including tires, drums, containers, and car parts, on the former Tommy's Auto-Clay Chapel Site located at 244 Thivener Road, Gallipolis, Ohio (Subject Property). The structures consist of various wood and metal barns and a concrete block and brick building. A Pre-Demolition Asbestos Survey report dated January 24, 2024, indicated that no asbestos containing materials (ACMs) were identified within the buildings surveyed. Demolition and debris removal activities are being completed to prepare the site for redevelopment. All activities will be completed in accordance with local, state, and federal regulations. The selected Contractor will be responsible for acquiring appropriate permits from the city, county, and other agencies, as required. Demolition and debris materials will be disposed off-site in accordance with local, state, and federal regulations and/or properly recycled whenever possible. The contractor and its subcontractors are required to be registered in the state of Ohio in good standing and be fully knowledgeable of all local, state, and federal regulations/requirements related to off-site disposal of demolition debris, including concrete and asphalt. Tetra Tech, Inc. is the Owner's Consultant and will oversee the demolition activities, record observations, and ensure health and safety practices are followed. Contractor award selection is anticipated to be made by September 17, 2024, followed by a notice to proceed on September 23, 2024. The expected completion date is December 31, 2024.

Post-Bid

Municipal

$100,000.00

Public - County

Demolition, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
23
Bidding Soon
505
All Active Projects
197
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2024

September 17, 2024

img_map_placeholder

244 Thivener Rd, Gallipolis, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.