BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Topeka, Kansas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This project consists of removal and replacement of failing concrete pavement panels on SW 21st St. located between SW Lincoln St. and SW Clay St. The deteriorating concrete pavement panels are located on the eastbound lanes of SW 21 St St. which is classified as minor arterial street, pose a significant concern. The concrete pavement panels are right in front of the driveway entrances, is undergoing severe structural damages. See Exhibit B for general construction limits. However, the exact project limits will be marked by the Construction Inspector prior to the beginning of construction. This segment of the street has a high volume of vehicular traffic. One lane of traffic in each direction on SW 21 st St. shall be maintained at all times during construction. All businesseslocated in & around the project limits must provide access at all times during construction. Refer the city standard drawing DT-120A (3) for the typical Temporary Traffic Control Plan for the four-lane undivided roadway - half roadway closed detail. 1 Remove & Replace 8" Reinforce Concrete Pavement 319.00 S.Y 2 Remove & Replace Curb & Gutter 60.00 L.F 3 Aggregate Base Course (Type AB-3) 117.70 Ton 4 Traffic Control 1.00 Lump Sum Contract Time: The schedule for this project is critical. The Work will commence as soon as practical with the issuance of a Start Work Order. Substantial Completion of the Work will be within 30 days from the date the Start Work Order is issued, and completed and ready for Final Completion and payment within 7 days from the date when Substantial Completion is achieved. All quantities included in the bid items are estimated. The City reserves the right to increase or decrease the project quantities based on actual conditions on-site, with the expressed understanding that no adjustment in unit prices will be made. Question Deadline 08/08/2024 at 10:00 PM CT All Lines Required : Yes Bid Bond Required :No

Award

Roads / Highways

$53,772.00

Public - City

Paving, Site Work

4

3

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
67
Bidding Soon
1,228
All Active Projects
499
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 15, 2024

September 16, 2024

October 16, 2024

img_map_placeholder

SW 21st St, Topeka, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.