BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a power facility in Darby, Pennsylvania. Conceptual plans call for the construction of a power facility; and for site work for a power facility.

Southeastern Pennsylvania Transportation Authority ("SEPTA") is soliciting proposals from qualified consultants for Architectural and Engineering ("A&E") Services for the Design of the Darby Traction Power Substation ("TPSS") Project. The purpose of this project is to provide Architectural and Engineering Services for the design of a new TPSS at SEPTA's Darby Transportation Center to support the increased power demand of the new light rail vehicles, expansion of the 102 Line, and potential charging capabilities. Darby TPSS will be built as part of SEPTA's Trolley Modernization Program. The new substation, which must be completed prior to the introduction of the new trolley fleet to SEPTA's light rail system in 2027, will provide SEPTA the ability to meet the electrical demands of the modern light rail vehicles and provide increased redundancy and operational flexibility. The new DC TPSS will be located on a parcel of SEPTA owned land adjacent to the existing Darby Transportation Center, near the intersection of 9th and Main Streets, in Darby Borough. The substation will have a 630 VDC nominal output and will supply DC traction power to the Route 11 and 13 trolleys and the future extension of the Rt 102 trolley. Question Deadline 08/29/2024 at 4:00 PM ET All questions pertaining to this request must be submitted, via email, to the Contract Administrator Email: kcyphers@septa.org Phone: 215-580-7636. Answers to submitted questions will be issued to all Proposers, via an Addendum, no later than COB on Wednesday, September 11, 2024. Subject to SEPTA's right to reject any and all proposals and/or to negotiate separately with any firm in any manner deemed appropriate to serve its best interests, if any award is made as a result of these proposals, it will be made on the basis of the proposal which best satisfies the intent of the RFP and other factors considered in the best interests of SEPTA. The method of Contractor Selection has not been Determined at this time.

Conceptual

Power Plant

$860,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
376
Active Projects
152
Bidding Soon
3,383
All Active Projects
1,542
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2025

img_map_placeholder

N MacDade Blvd, Darby, PA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.