BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Holland, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

2.0 miles of detailed pavement removals and hot mix asphalt repairs in composite pavement sections. All work shall conform to the 2020 MDOT Standard Specifications for Construction. Pavement shall be removed to the limits detailed in the plans and reconstructed using hot mixed asphalt. Location :It is the intent of the Ottawa County Road Commission to contract joint work for MDOT on 196 westbound between 56th Street and 60th Street, in Laketon and Fillmore Townships, Allegan County, Michigan. The pavement section shall be saw cut and fully removed to the limits detailed in the plans. Removals shall be to the aggregate base course. Hot mixed asphalt shall be used to reconstruct the pavement section to the existing grade. The contactor shall take care to properly match the existing finish grade. Deviations of 1/8 inch in 10ft or more will require surface profiling at the contactors expense to properly match the existing pavement surface. Lane 2 noted in the patch log is designated as the right outside most driving lane. Start work within 10 days after receiving the notice of award or contract or as approved by MDOT project staff. In no case shall work commence prior to receipt of formal notice of award. Work shall not commence prior to September 3re, 2024. The entire project shall be completed on or before September 30th, 2024.

Award

Roads / Highways

$147,950.00

Public - County

Paving, Site Work

6

3

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
30
Bidding Soon
481
All Active Projects
211
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2024

September 3, 2024

img_map_placeholder

I-196, Holland, MI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.