Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Holland, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.
2.0 miles of detailed pavement removals and hot mix asphalt repairs in composite pavement sections. All work shall conform to the 2020 MDOT Standard Specifications for Construction. Pavement shall be removed to the limits detailed in the plans and reconstructed using hot mixed asphalt. Location :It is the intent of the Ottawa County Road Commission to contract joint work for MDOT on 196 westbound between 56th Street and 60th Street, in Laketon and Fillmore Townships, Allegan County, Michigan. The pavement section shall be saw cut and fully removed to the limits detailed in the plans. Removals shall be to the aggregate base course. Hot mixed asphalt shall be used to reconstruct the pavement section to the existing grade. The contactor shall take care to properly match the existing finish grade. Deviations of 1/8 inch in 10ft or more will require surface profiling at the contactors expense to properly match the existing pavement surface. Lane 2 noted in the patch log is designated as the right outside most driving lane. Start work within 10 days after receiving the notice of award or contract or as approved by MDOT project staff. In no case shall work commence prior to receipt of formal notice of award. Work shall not commence prior to September 3re, 2024. The entire project shall be completed on or before September 30th, 2024.
Award
Roads / Highways
$147,950.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 12, 2024
September 3, 2024
I-196, Holland, MI
Related To This Project
Holland, MI
--
Holland, MI
--
Holland, MI
--
Holland, MI
Bid Date: Sep 11 2024
Holland, MI
Bid Date: Sep 19 2024
Holland, MI
Bid Date: Sep 26 2024
Holland, MI
Bid Date: Aug 20 2024
Holland, MI
Bid Date: Aug 12 2024
Holland, MI
Bid Date: Aug 08 2024
Holland, MI
Bid Date: Aug 15 2024
Holland, MI
Bid Date: Aug 14 2024
Holland, MI
Bid Date: Jul 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.