Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 10, 2024 at 8:00 PM
Updated October 11, 2024
Site work for a water / sewer project in Forks, Washington. Completed plans call for site work for a water / sewer project.
Olympic Corrections Camp UST Decommissioning. Site Address: Olympic Corrections Camp Hoh Mainline Rd. Site Directions: Olympic Correctional Camp at the Hoh Mainline Rd (Clearwater Road). Lat. 47.715279, Long. -124.1333299. From Olympia: Travel North on US 101N for roughly 105 miles to Clearwater Road near Queets, WA. Turn right on Clearwater RD (Hoh Mainline). Follow Clearwater Road and the Hoh Mainline for roughly 18.5 miles. Turn right into the Olympic Corrections Camp. Drivers can also approach from the North. This route is recommended for larger vehicles due to better road conditions and visibility. From Olympia: Travel North on US 101N for roughly 145 miles to Hoh Mainline (north entrance South of Forks, WA). Turn right on Hoh Mainline. Follow Hoh Mainline for 11.5 miles. Turn left into the Olympic Corrections Camp. The estimated cost of the project is $220,902, and the required substantial completion date is November 29, 2024. The project is located at the Olympic Corrections Camp at the Hoh Mainline Rd. Lat. 47.715279, Long. -124.1333299. Description: The project consists of the decommissioning and removal and disposal of two 6,000 gallon Underground Storage Ranks (UST), one 4,000 gallon UST, one 1,000 gallon UST, one 3,000 gallon Oil-Water Separator, and one 550 gallon holding tank. Backfill and paving of the excavated sited in accordance with the project Technical Specifications and Plans. This work is being completed adjacent to a Category III wetland and includes requirements for SEPA compliance. The project occurs within a Correctional Facility and all workers will need to have a background check. Est. Value: $ 220,902.00. Est. Completion Date: Nov. 29, 2024. This Route is Recommended for Larger Vehicles Due to Better Road Conditions and Visibility. From Olympia: Travel North on Us 101n for Roughly 145 Miles to Hoh Mainline (North Entrance South of Forks, Wa). Turn Right on Hoh Mainline. Follow Hoh Mainline for 11.5 Miles. Turn Left Into the Olympic Corrections Camp. LAST DAY FOR QUESTIONS IS August 22nd.
Award
Water / Sewer
$165,427.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 28, 2024
September 30, 2024
11235 Hoh Mainline, Forks, WA
Related To This Project
Forks, WA
Bid Date: Sep 05 2024
Forks, WA
--
Forks, WA
--
Forks, WA
--
Forks, WA
Bid Date: Apr 08 2025
Forks, WA
Bid Date: Aug 20 2024
Forks, WA
--
Forks, WA
Bid Date: Jun 24 2024
Forks, WA
Bid Date: Jun 20 2024
Forks, WA
Bid Date: May 09 2024
Forks, WA
Bid Date: Feb 22 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
