BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 9, 2024 at 8:00 PM

Updated August 10, 2024

Site work and paving for a bridge / tunnel in Forks, Washington. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The project consists of, but is not limited to, providing all materials, labor and equipment to prepare concrete substrate, apply epoxy crack seal, and apply carbon fiber reinforced polymer strengthening to bridge diaphragms and girders. The estimated cost of the project is $98,125 , and the required substantial completion date is September 30, 2024. The project is located at Lat 47 38'13.2 N, Long 124 15'10.8 W. Site Directions: At mile post 147 on HWY 101 turn north onto Clearwater Road. Follow 8.4 miles until you reach Shale Creek Bridge. Site Address: 4738'13.2"N 12415'10.8"W Completion- September 30, 2024. The estimated cost of the project is $229,800

Under Construction

Bridges / Tunnels

$200,700.00

Public - State/Provincial

Paving, Site Work

7

10

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
38
Bidding Soon
443
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

July 9, 2024

Project location map

Multiple Locations, Forks, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.