BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Sacramento, California. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Question Deadline 09/20/2024 at 4:00 PM PT Direct pre-bid questions to the Project Manager, Keith Gotwalt, via the Q&A tab in the portal The Project includes, without limitation, furnishing all necessary labour, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in specifications. This Work will be performed in strict conformance with the specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County. The work to be performed under this contract includes the furnishing of all labour, materials, equipment, and other incidental work for: Construction of complete street improvements, specifically sidewalks, curb and gutter, class IV bike lanes, traffic signal modifications, bus turnouts, landscaped medians, street lighting, traffic signal interconnect, and pavement rehabilitation and replacement. All labour on the project shall be paid no less than the minimum wage rates as established by the U.S. Secretary of Labour or as determined by the Director of the California Department of Industrial Relations. The higher of the two rates will be paid in accordance with the following statutes: A. The Davis Bacon Act and related federal acts; or B. California Labour Code section 1770 et seq. Copies of the minimum wage rates established by the Secretary of the U.S. Department of Labour. Each bid must be submitted on the bid forms provided in the Contract Documents; however, if none are provided, the surety may issue on its own paper. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the Treasurer of Sacramento County, or cash for an amount not less than ten percent (10%) of the aggregate sum of the bid. The successful bidder shall be required to execute a material and labour Payment Bond and Performance Bond, issued by a corporate surety, acceptable to the County of Sacramento, each for not less than one hundred percent (100%) of the contract price. The County of Sacramento will not accept lower State wage rates not specifically included in the Federal Minimum Wage Decision. This includes "helper" (or other classifications based on hours of experience) or any other classification not appearing in the Federal Wage Decision. Where the Federal Wage Decision does not contain the State wage rate determination. The Board reserves the right to reject any or all bids, to waive any informality in any bid, and to determine which bid, in their judgment, is the lowest responsive bid of a responsible Bidder.

Award

Roads / Highways

$7,427,955.00

Public - County

Outdoor Lighting, Paving, Site Work

71

9

27

6

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
81
Bidding Soon
1,697
All Active Projects
696
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2024

December 2, 2024

img_map_placeholder

Arden way, Sacramento, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.