BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 21, 2024 at 8:00 PM

Updated August 22, 2024

Site work for a bridge / tunnel in Cedar Falls, Iowa. Completed plans call for site work for a bridge / tunnel.

Olive Street Box Culvert Replacement Project will remove and replace the existing 2 span slab bridge with a twin 10X8 box culvert. The current bridge is poor condition with advanced deterioration. This project includes streambank restoration between College Street and Olive Street. As of August 21, 2024, the project is currently under construction. The firm construction timeline was not disclosed.

Under Construction

Bridges / Tunnels

$540,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
120
Bidding Soon
1,436
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2022

Project location map

Olive St, Cedar Falls, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.