Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, renovation and addition to a transportation facility in San Francisco, California. Completed plans call for the addition of a transportation facility; for the demolition of a transportation facility; for the renovation of a transportation facility; and for site work for a transportation facility.
https://www.constructiondive.com/news/9-largest-commercial-construction-starts-august-2024/728086/ The $2.9 billion terminal 3 modernization at the San Francisco International Airport in San Francisco. ______________________________________ https://www.turnerconstruction.com/insights/turner-breaks-ground-on-2-6-billion-sfo-terminal-3-west-modernization Turner, along with design-build partners Gensler and TEF, is proud to announce the groundbreaking of the Terminal 3 West Modernization project at San Francisco International Airport (SFO). Turner will lead the $2.6 billion transformation of the terminal which will result in a modern, world-class facility. This project is set to redefine the passenger experience with a focus on comfort, efficiency, and sustainability. The project includes a 200,000 square foot expansion of Terminal 3, 650,000 square feet of renovation, and a new six-story building that will house airline lounges and operational office space. As part of the modernization project, Turner is constructing temporary corridors to reroute passengers safely around the construction zone. This "one and done" process was planned to reduce the complexities of multiple moves of the corridors over the project's duration. The 1,000-foot West Corridor and 400-foot East Corridor were fabricated as 11 modules at a nearby air cargo yard to avoid disruption to travelers. Following technical and thoughtful planning which sought to minimize impact on airport operations and travelers, the modules were transported across the airfield over 11 consecutive nights, as seen here. The Terminal 3 West Modernization will introduce cutting-edge amenities, expanded concessions, and enhanced security features. Passengers will benefit from a redesigned check-in area, improved baggage handling systems, and a more intuitive wayfinding experience. The modernization also includes the installation of advanced technology systems aimed at streamlining airport operations and enhancing passenger flow. "This project represents not only a significant investment in the future of air travel but also in our commitment to building sustainably," said Tina Smith, Construction Executive at Turner, "Our team is dedicated to creating a terminal that not only meets the highest standards of efficiency and comfort but also serves as a model for environmental stewardship in the aviation industry." A significant aspect of this project is its commitment to sustainability. The terminal will incorporate energy-efficient systems, water-saving fixtures, and materials sourced from sustainable suppliers. The project aims to achieve LEED Platinum certification, demonstrating SFO's dedication to environmental responsibility. "This groundbreaking marks a milestone in our longstanding partnership with SFO," said Nino Adamo, Turner's Vice President & General Manager, "this project is an opportunity to showcase our expertise in delivering large-scale, complex projects that align with our values of innovation, quality, and sustainability. Our relationship with SFO has been built on trust and collaboration, and we are excited to continue this journey together as we transform Terminal 3 West into a state-of-the-art facility." The expansion portion of the project is scheduled to open in the fall of 2027, with eastern addition side of Terminal 3 opening in 2029. _______________ Scope Description The Courtyard 4 Connector (C4C) Project is a new 7-story core-and-shell building, part of the overall Terminal 3 West (T3W) Modernization Project. The T3W Project is a continuation of the Terminal 3 (T3) Program at San Francisco International Airport (SFO), which began with renovations and expansions of Boarding Area E (BAE) and Terminal 3 East (T3E). The T3W Project will renovate the western half of Terminal 3 to the same level of passenger experience that was achieved in the other airport terminal projects. Completed prequalification packets are due to Turner no later than 8/16/2024. Trade Package # CM xx C4C Trade Package Exterior Skin (Design Portion) LBE Participation Requirement 21.5% Please contact Patty Heredia, pheredia@tcco.com on how to get prequalified with Turner Construction. Construction start is expected to be Q2, 2026.
Post-Bid
Transportation Terminals
$600,000.00
Public - City
Addition, Demolition, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 19, 2024
July 15, 2026
To Be Determined, San Francisco, CA
Related To This Project
San Francisco, CA
Bid Date: Aug 15 2024
San Francisco, CA
Bid Date: Sep 04 2024
San Francisco, CA
--
San Francisco, CA
Bid Date: Sep 11 2024
San Francisco, CA
--
San Francisco, CA
Bid Date: Aug 28 2024
San Francisco, CA
Bid Date: Aug 28 2024
San Francisco, CA
Bid Date: Aug 21 2024
San Francisco, CA
Bid Date: Aug 19 2024
San Francisco, CA
--
San Francisco, CA
Bid Date: Sep 12 2024
San Francisco, CA
Bid Date: Sep 12 2024
San Francisco, CA
Bid Date: Sep 12 2024
San Francisco, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.