BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, renovation and addition to a transportation facility in San Francisco, California. Completed plans call for the addition of a transportation facility; for the demolition of a transportation facility; for the renovation of a transportation facility; and for site work for a transportation facility.

https://www.constructiondive.com/news/9-largest-commercial-construction-starts-august-2024/728086/ The $2.9 billion terminal 3 modernization at the San Francisco International Airport in San Francisco. ______________________________________ https://www.turnerconstruction.com/insights/turner-breaks-ground-on-2-6-billion-sfo-terminal-3-west-modernization Turner, along with design-build partners Gensler and TEF, is proud to announce the groundbreaking of the Terminal 3 West Modernization project at San Francisco International Airport (SFO). Turner will lead the $2.6 billion transformation of the terminal which will result in a modern, world-class facility. This project is set to redefine the passenger experience with a focus on comfort, efficiency, and sustainability. The project includes a 200,000 square foot expansion of Terminal 3, 650,000 square feet of renovation, and a new six-story building that will house airline lounges and operational office space. As part of the modernization project, Turner is constructing temporary corridors to reroute passengers safely around the construction zone. This "one and done" process was planned to reduce the complexities of multiple moves of the corridors over the project's duration. The 1,000-foot West Corridor and 400-foot East Corridor were fabricated as 11 modules at a nearby air cargo yard to avoid disruption to travelers. Following technical and thoughtful planning which sought to minimize impact on airport operations and travelers, the modules were transported across the airfield over 11 consecutive nights, as seen here. The Terminal 3 West Modernization will introduce cutting-edge amenities, expanded concessions, and enhanced security features. Passengers will benefit from a redesigned check-in area, improved baggage handling systems, and a more intuitive wayfinding experience. The modernization also includes the installation of advanced technology systems aimed at streamlining airport operations and enhancing passenger flow. "This project represents not only a significant investment in the future of air travel but also in our commitment to building sustainably," said Tina Smith, Construction Executive at Turner, "Our team is dedicated to creating a terminal that not only meets the highest standards of efficiency and comfort but also serves as a model for environmental stewardship in the aviation industry." A significant aspect of this project is its commitment to sustainability. The terminal will incorporate energy-efficient systems, water-saving fixtures, and materials sourced from sustainable suppliers. The project aims to achieve LEED Platinum certification, demonstrating SFO's dedication to environmental responsibility. "This groundbreaking marks a milestone in our longstanding partnership with SFO," said Nino Adamo, Turner's Vice President & General Manager, "this project is an opportunity to showcase our expertise in delivering large-scale, complex projects that align with our values of innovation, quality, and sustainability. Our relationship with SFO has been built on trust and collaboration, and we are excited to continue this journey together as we transform Terminal 3 West into a state-of-the-art facility." The expansion portion of the project is scheduled to open in the fall of 2027, with eastern addition side of Terminal 3 opening in 2029. _______________ Scope Description The Courtyard 4 Connector (C4C) Project is a new 7-story core-and-shell building, part of the overall Terminal 3 West (T3W) Modernization Project. The T3W Project is a continuation of the Terminal 3 (T3) Program at San Francisco International Airport (SFO), which began with renovations and expansions of Boarding Area E (BAE) and Terminal 3 East (T3E). The T3W Project will renovate the western half of Terminal 3 to the same level of passenger experience that was achieved in the other airport terminal projects. Completed prequalification packets are due to Turner no later than 8/16/2024. Trade Package # CM xx C4C Trade Package Exterior Skin (Design Portion) LBE Participation Requirement 21.5% Please contact Patty Heredia, pheredia@tcco.com on how to get prequalified with Turner Construction. Construction start is expected to be Q2, 2026.

Post-Bid

Transportation Terminals

$600,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
81
Bidding Soon
1,792
All Active Projects
745
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2024

July 15, 2026

img_map_placeholder

To Be Determined, San Francisco, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.