BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Collierville, Tennessee. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work shall be undertaken in two (2) phases; Phase 1 being in the Summer/Fall Season of 2024 and Phase 2 being in the Spring Season of 2025 Please Note: As a part of doing business with the Town of Collierville, Tennessee, each individual, company or organization is required to obtain a Vendor Number to reference when requesting a copy of any bid. Question Deadline 08/16/2024 SCOPE OF THE CONTRACT The work under this contract shall be addressed and undertaken in two (2) separate phases; Phase 1 - Fall 2024 and Phase 2 - Spring 2025. Both phases will be within the Town of Collierville's Fiscal Year 2025. If conditions warrant and it becomes necessary, some of the work listed under Phase 1 - Fall 2024 may be carried over to the Phase 2 - Spring 2025. Under no circumstances shall a street or subdivision be partially completed in Phase 1 and then carried over to Phase 2. No work listed under Phase 2 -Spring 2025 shall be undertaken during Phase 1 - Fall 2024. The work included by the GENERAL and TECHNICAL SPECIFICATIONS consists of furnishing all labor, equipment and materials required in performing all operations necessary in connection with street resurfacing at various locations within the Town. Surface adjustment of Town manhole rings and valve rings, as requested by the Town, will also be required

Bid Results

Roads / Highways

$2,169,460.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
97
Bidding Soon
834
All Active Projects
375
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 21, 2024

September 20, 2024

June 15, 2025

img_map_placeholder

Multiple Locations, Collierville, TN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.