Site work for a water / sewer project in Boxborough, Massachusetts. Completed plans call for site work for a water / sewer project.

Gasoline/Diesel Fuel Storage System Installation Project The Work consists of installing one gas/diesel 6,000 gallon above ground fuel storage tank with connects made to the existing product dispenser and all work incidental thereto, in accordance with the Specifications and conceptual plans attached hereto. 1. All site preparation, including asphalt removal, excavation, backfill, grading, 3rd party compaction testing, subbase preparation, concrete/reinforcement placement, compression strength and slump testing, and testing documentation. 2. The purchase, delivery, storage, and installation of a 6,000-gallon, split compartment (3,000/3,000), aboveground storage tank 3. The purchase, delivery, storage, and installation of leak sensors, vapor recovery equipment, transition sump, fill cabinet, product piping, controls, equipment, electrical, mechanical, traffic barriers, fencing, startup, testing, training, leak sensors, warrantee work, painting, signage, labels, complete functioning system in accordance with the plans and specifications. 4. The purchase, delivery, storage, and installation of new buried fuel piping and fittings, including trench excavation and preparation, backfill to within 4 inches of finished grade with specified backfill material, lining, compaction, connections to sumps. 5. Re-use existing dispenser and card reader system. 6. The purchase, delivery, storage, and installation of new dispenser sump, leak sensor, piping, connections, equipment, concrete work and restoration, connect new piping and electrical conduit, startup, testing, training, warrantee work, painting, signage, labels, complete functioning system. 7. Temporarily close existing underground storage tanks and piping in accordance with 310 CMR 80.00. 8. Segregate oils according to regulated and non-regulated soils. Stockpile all soil and other excavation materials generated on site based on the Contractor's activities and in accordance with the direction of the Owner's Licensed Site Professional (LSP) on and covered by poly sheeting. The Owner will be responsible for non-regulated soil disposal. The Contractor will dispose of regulated soils according to the Unit Prices provided on the Form for General Bid and as directed by the LSP. 9. All Work either shown on the Drawings or included in the specifications unless specifically indicated as not to be done. 10. Provide and install all equipment and materials unless otherwise specifically excluded.

Bid Results

Water / Sewer

$249,500.00

Public - City

Site Work

9

15

6

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
411
Active Projects
228
Bidding Soon
3,054
All Active Projects
1,439
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2024

October 4, 2024

img_map_placeholder

577 Massachusetts Ave, Boxborough, MA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.